Similar Projects
Rasmussen College
Renovation - 44,000 SF
Conception
Odessa, FL

University Station Hollywood - Master Plan
New Construction, Build-Out - 11,000 SF
Conception
$40,336,400 est. value
Hollywood, FL 33020

USF Wellness Center Complex Phase 1
New Construction - 47,067 SF
Design
Less than $20,000,000 est. value
Tampa, FL

Herbert University Center Kitchen Addition
Addition - 6,620 SF
Design
$2,000,000 est. value
Jacksonville, FL

UNF Mednexus Renovation at FSCJ Deerwood Campus
Renovation
Bidding
Gainesville, FL

Special Collections Building - Design-Build Services
- 30,000 SF
Post-Bid
Less than $8,000,000 est. value
Gainesville, FL

Broward College - South Campus Building 99 Aviation Portable Classroom
Post-Bid
Pembroke Pines, FL 33024

Student Health Care Center, Phase II
Results
Less than $20,500,000 est. value
Gainesville, FL 32611

Elevator Modernizations for Basic Science and Communicore Buildings
Results
Gainesville, FL 32603

Blount Center Expansion
Addition - 86,311 SF
Construction
Less than $26,000,000 est. value
Gainesville, FL

The Malachowsky Data Sciences and Information Technology
- 260,000 SF
Construction
Less than $135,000,000 est. value
Gainesville, FL

New University House
New Construction
Conception
$11,800,000 est. value
Gainesville, FL

Building 0308 FLMNH - North Florida Water Galley
New Construction
Design
$2,750,000 est. value
Gainesville, FL

UF-200 New Public Safety Building and Centrex Building Renovation
New Construction, Renovation - 57,903 SF
Post-Bid
Less than $20,000,000 est. value
Gainesville, FL 32611

Design/Build Services - Building 54, Fire Mitigation Renovations
Renovation
Results
Less than $6,250,000 est. value
Pensacola, FL 32514

Reported 05/29/2021 12:00 AM
Project Title

General Contractor Annual Pre-Qualification Renewal

Physical Address View project details and contacts
City, State (County) State-Wide: FL
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualification statements from qualified general contracting firms interested in renewing their pre-qualification status for the College’s construction projects of all dollar levels. General Contractors must be prequalified annually to be eligible to compete in construction projects at all dollar levels that arise during the qualification period. Qualification Renewal Period: July 1, 2021 - June 30, 2022.

Details

College/University, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents