Similar Projects
Last Updated | 07/18/2022 02:43 AM |
Project Title | United Learning Center |
Physical Address | View project details and contacts |
City, State (County) | Centralia, WA 98531 (Lewis County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Clubhouse/Social Club, Museum |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $7,875,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site work, paving and new construction of a mixed-use development in Centralia, Washington. Completed plans call for the construction of a 10,500-square-foot clubhouse / community center; for site work for a clubhouse / community center; 4,600-square-foot museum; and 2,230-square-foot museum. The United Learning Center Project consists of a new, single-story, grounds-up building with 3 non-separated tenant spaces for an early learning center, and children's museum, and future child-focused business. The design also includes a partially covered playground yard. The building will be sprinklered type V-B consisting of concrete slabs and footings and wood-framed structure, including cross-laminated timber and glued-laminated construction. Roofing systems include sloped standing seam metal and TPO singly ply membrane. Exterior cladding includes brick, composite wood wall panels, and fiber-cement wall panels. Total building area is 17,300 sq. ft., broken down as follows: a. Early Learning Center: 10,500 sq. ft. b. Children's Museum:4,600 sq. ft. c. Tenet Space: 2,230 sq. ft An open park space on northern most part of the site accommodates water retention pond and other Work indicated in Contract Documents. Certified check, bank cashier's check, or bid bond is required with each Bid, equal to 5 percent of the total Base Bid only. Make checks payable to the United Way of Lewis County; furnish bond executed by a licensed bonding agency authorized to do business in the locality of the project. Attach to provided Bid Form. Pursuant to RCW 39.12, no worker, laborer, or mechanic employed in the performance of any part of this Contract shall be paid less than the prevailing rate of wage (in effect as the date the bids are due) as determined by the Industrial Statistician of the Department of Labor and Industries. Copies of the prevailing wage rate schedule are available directly from the Department of Labor and Industries A mandatory minimum 15 percent apprentice labor hours of the total labor hours are a requirement of the construction contract. Bidders may contact the Department of Labor & Industries, Apprenticeship No Bid may be withdrawn, except with the express permission of the Owner, after the hour set for the opening thereof, unless the award of Contract is delayed for a period exceeding 45 days.Section, to obtain information on available apprenticeship programs Pre-Bid Questions and substitutions are due no later than 5:00 PM local time on Monday, 23 May 2022 via email to the Project Manager at KMB Architects (emilymoneymaker@kmb-architects.com) The Owner reserves the right to accept the lowest or any other Bid, the right to reject any or all Bids, and the right to waive any irregularities in any Bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||
Details | 17,330 SF - Museum, 4,600 SF New Construction, Museum, 2,230 SF New Construction, Clubhouse/Social Club, 10,500 SF New Construction, Clubhouse/Social Club, 17,300 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |