Reported | 06/10/2022 12:00 AM |
Project Title | Water Street Sewer Interceptor Replacement |
Physical Address | View project details and contacts |
City, State (County) | Plymouth, MA 02360 (Plymouth County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,671,118 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work under this Contract includes, but is not necessarily limited to the following major items: 1. Furnishing all labor, services, equipment, and materials for the installation and testing of approximately 1,300 linear feet of new 30-inch diameter SDR26 PVC gravity sewer interceptor. 2. Furnishing all labor, services, equipment, and materials for removal and legal disposal of existing gravity sewer mains and installation and testing of approximately 180 linear feet of new 8-inch, 12-inch, and 24-inch SDR26 PVC gravity sewer mains. 3. Cleaning and CCTV inspection of the existing 30” RCP Sewer Interceptor. Cutting and capping of the existing 30” RCP Sewer Interceptor following completion of cleaning and CCTV inspection. Removing and legally disposing of existing Sewer Interceptor manhole frames, covers, and concentric top sections. Plugging, flow filling, and abandoning existing Sewer Interceptor manholes in place. 4. Furnishing all labor, services, equipment, and materials for the removal and legal disposal of existing gravity sewer services and installation of new C900 PVC (vertical chimneys) and SDR26 PVC (horizontal) gravity sewer services and cleanouts up to the property line. Confirm all existing non-capped sewer services have been reconnected at the property line. 5. Furnishing, installation, testing, operation, and maintenance of sewer bypass pumping system and appurtenances to maintain uninterrupted sewer service throughout the duration of construction. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |