Similar Projects
Sewer PVC Fittings
Infrastructure
Bidding
Brockton, MA 02301

On Call Service Calls, Drain Cleaning
Term Contract
Post-Bid
$150,000 est. value
Brockton, MA

Sewer Ejector Conversion
Infrastructure
Post-Bid
Rockland, MA

Manhole Rehabilitation Project Phase 2
Results
$220,713 est. value
Abington, MA 02351

Scheduled and Emergency Drainage Structure and Pipe Cleaning at Various Locations
Results
Less than $493,650 est. value

Sewer Force Main Replacement
Infrastructure
Post-Bid
$11,200,000 est. value
Whitman, MA

2021 Sewer System Rehabilitation
Results
$1,250,000 est. value
Brockton, MA

Construction for the Water Street Sewer Interceptor
Infrastructure
Post-Bid
$4,671,118 est. value
Plymouth, MA 02360

Court Street Sewer Main Replacement
Results
Plymouth, MA

Sewage Disposal System Components Upgrade, Parsons Lane 667-1 & 705-1
Infrastructure
Post-Bid
$318,820 est. value
Halifax, MA 02338

Point Allerton Avenue Sewer Repairs
Results
Hull, MA 02045

Abandonment of Existing Septic Tanks, FAST Tank and Blower System
Infrastructure
Post-Bid
$318,820 est. value
Halifax, MA

Point Allerton Avenue Sewer Repairs
Results
$45,000 est. value
Hull, MA 02045

On-Call Emergency Repairs for Horizontal Utilities (Water, Sewer and Drain)
Infrastructure
Results
$150,000 est. value
Plymouth, MA

FY 22 Catch Basin Cleaning Services
Term Contract
Results
Hanover, MA

Reported 06/10/2022 12:00 AM
Project Title

Water Street Sewer Interceptor Replacement

Physical Address View project details and contacts
City, State (County) Plymouth, MA 02360   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $4,671,118 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work under this Contract includes, but is not necessarily limited to the following major items: 1. Furnishing all labor, services, equipment, and materials for the installation and testing of approximately 1,300 linear feet of new 30-inch diameter SDR26 PVC gravity sewer interceptor. 2. Furnishing all labor, services, equipment, and materials for removal and legal disposal of existing gravity sewer mains and installation and testing of approximately 180 linear feet of new 8-inch, 12-inch, and 24-inch SDR26 PVC gravity sewer mains. 3. Cleaning and CCTV inspection of the existing 30” RCP Sewer Interceptor. Cutting and capping of the existing 30” RCP Sewer Interceptor following completion of cleaning and CCTV inspection. Removing and legally disposing of existing Sewer Interceptor manhole frames, covers, and concentric top sections. Plugging, flow filling, and abandoning existing Sewer Interceptor manholes in place. 4. Furnishing all labor, services, equipment, and materials for the removal and legal disposal of existing gravity sewer services and installation of new C900 PVC (vertical chimneys) and SDR26 PVC (horizontal) gravity sewer services and cleanouts up to the property line. Confirm all existing non-capped sewer services have been reconnected at the property line. 5. Furnishing, installation, testing, operation, and maintenance of sewer bypass pumping system and appurtenances to maintain uninterrupted sewer service throughout the duration of construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents