Similar Projects
Z--Replace HVAC Units in Park Housing
Term Contract
Bidding
$25,000 to $100,000 est. value
Medora, ND 58645

Ben Franklin Middle School Air Conditioning Upgrades
Alteration
Bidding
Fargo, ND 58102

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Bismarck Public Schools Facility Air Quality Upgrade
Results
Bismarck, ND

Cooling Tower Replacement at VFW Sports Center Rink 2
Results
Bismarck, ND 58501

Minot AFB Computer Room Air Conditioning (CRAC) Unit Removal
Post-Bid
Minot Air Force Base, ND

Jack Science Center Chiller Line Replacement
Post-Bid
Bismarck, ND 58501

HVAC Improvements
Post-Bid
Minot, ND 58701

HVAC Improvements
Post-Bid
ND

Central MS Boiler Replacement
Post-Bid
Devils Lake, ND 58301

Computer Room Air Conditioner (CRAC)
Post-Bid
Minot Air Force Base, ND

Rose Creek Clubhouse Rooftop Units and Exhaust Fans Replacement
Alteration
Post-Bid
$120,000 est. value
Fargo, ND 58104

Fargo Sub Service, Repair, Replace A/C Condensing Unit and Evaporator
Term Contract
Post-Bid
West Fargo, ND 58078

Job Service North Dakota HVAC Maintenance Agreement
Term Contract
Post-Bid

Reported 06/16/2021 12:00 AM
Project Title

Sodexo Kitchen Hood Remodel

Physical Address View project details and contacts
City, State (County) Dickinson, ND 58601   (Stark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Add new 5’x5’ class 1 hood for new icombi convection/steamer oven and duct up through floor. New roof exhaust fan. Install a new roof mounted exhaust fan and duct to tunnel space in hallway outside of basement kitchen for ventilation of existing tunnel space. Modify existing duct system by dishwasher to convert to intake for tunnel ventilation. Install two SS divider panels under hoods to separate fryers and cooktop and also between new steamer oven and adjacent sink. Duct insulation to both new class 1 ductwork to roof and exhaust duct work for tunnel ventilation, roofing fees included. Physical moving and locating of kitchen equipment under hood system, modifications to existing Ansul system and electoral wiring are excluded from this bid.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents