Similar Projects
Custer Creek Shopping Center
Renovation - 25,600 SF
Construction
$850,000 est. value
Richardson, TX 75080

Lake Vista Shopping Center
New Construction - 18,000 SF
Construction
$2,000,000 est. value
Lewisville, TX 75067

Alta Vista Shopping Center
Renovation
Post-Bid
Dallas, TX 75228

Alta Vista Shopping Center
Renovation
Post-Bid
Dallas, TX 75228

Restore Hyper Wellness and Cryotherapy
Build-Out
Design
$200,000 to $300,000 est. value
Colleyville, TX 76034

Lucas Retail Shopping Center
New Construction - 10,450 SF
Design
$1,000,000 est. value
Lucas, TX

The Hill Shopping Center - Exterior Renovations
Renovation
Post-Bid
Dallas, TX 75231

Restore Hyper Wellness & Cryotherapy
Build-Out - 2,835 SF
Construction
$300,000 to $400,000 est. value
Frisco, TX 75034

Radford Hills Shopping Center
Renovation - 54,000 SF
Construction
$750,000 est. value
Abilene, TX 79600

Burkes/Home Centric #506
Renovation - 25,088 SF
Pending Verification
$357,052 est. value
Brownwood, TX 76801

Irving Towne Center
Renovation
Construction
Irving, TX 75062

Longview Mall
Renovation
Construction
Longview, TX 75605

Last Updated 07/11/2022 09:20 AM
Project Title

Lozano Plaza Restroom

Physical Address View project details and contacts
City, State (County) Harlingen, TX 78550   (Cameron County)
Category(s) Commercial
Sub-Category(s) Shopping Center/Strip Mall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Harlingen reserves the right to reject any or all proposals, to waive defects and formalities or technicalities in such proposals, to award the contract to the respondent which it considers has submitted the best and most advantageous proposal, and to hold all proposals for a period of sixty (60) days without taking any action thereon. Scope of Work: Refer to drawings for a detailed Scope of Work. 1. Provide all materials and labor associated with new fully-operational plumbing systems for the project "City of Harlingen Lozano Plaza Restroom", including but not limited to the following: a. Plumbing fixtures and appliances such as water closets, lavatories, faucets, drinking fountains, domestic water heaters, floor drains, valves, fittings, hardware and specialties. b. Potable water distribution piping and service connections to site utilities. c. Sanitary wastewater and vent piping and service line connections to site utilities

Details

695 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents