Similar Projects
Minooka Ridge Business Park - Phase 1
New Construction, Infrastructure - 1,100,000 SF
Conception
$120,000,000 est. value
Minooka, IL

Minooka Road Regional Lift Station and Force Main - Village of Minooka
Infrastructure
Conception
$450,000 CJ est. value
Minooka, IL 60447

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Intersections of IL 47 and Pine Bluff Road and at the Intersection of IL 47 and Southmor Road South of Morris
Infrastructure
Results
IL

Milling and Resurfacing on IL 113
Infrastructure
Results
$4,000,000 est. value
Coal City, IL 60416

Streator Onized Credit Union / Morris
New Construction, Infrastructure - 2,800 SF
Pending Verification
$650,000 CJ est. value
Morris, IL 60450

Streator Onized Credit Union / Morris
New Construction, Infrastructure - 2,800 SF
Pending Verification
$650,000 CJ est. value
Morris, IL 60450

Administration Parking Lot Replacement - County of Grundy
Infrastructure
Conception
$650,000 CJ est. value
Morris, IL 60450

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

2022 Sidewalk Replacement Program Contract
Infrastructure
Results
$400,000 est. value
Minooka, IL

Dupont Road Reseal - Grundy County
Infrastructure
Conception
$840,000 CJ est. value
Morris, IL 60450

Well 7 Construction, Contract 2-2021
Infrastructure
Post-Bid
$180,000 CJ est. value
Minooka, IL 60447

2022 Sidewalk Saw-Cutting Program Contract
Infrastructure
Results
$400,000 est. value
Minooka, IL

Kankakee Road over Granary - Grundy County
Infrastructure
Conception
$420,000 CJ est. value
Gardner, IL 60424

Last Updated 10/03/2023 12:53 PM
Project Title

Street Reconstruction and Water Main Improvements Including Earth Excavation, Aggregate Base Course, HMA Binder Course

Physical Address View project details and contacts
City, State (County) Morris, IL 60450   (Grundy County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $289,912 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 03, 2023, project was awarded to Porter Brothers Asphalt & Sealing, awarded amount is $289,912.48 City/County Mt Morris Street reconstruction and water main improvements including Earth Excavation (1,214 Cu Yd); Aggregate Base Course, Type B (1,395 Ton); HMA Binder Course, IL-19.0, N50 (273 Ton); HMA Surface Course, Mix C, N50 (164 Ton); PCC Driveway Pavement, 7 (268 Sq Yd); Comb. Conc. Curb & Gutter, Type B-6.18 (909 Foot); Traffic Control and Protection, Special (1 LSum); Water Main, 8 Dia. (325 Foot); Ductile Iron Fittings (703 Pound); and related appurtenances Project Location: Sunset Lane from Mulberry Ave. to Seminary Ave Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. IL DOT - Street Reconstruction and Water Main Improvements Including Earth Excavation, Aggregate Base Course, HMA Binder Course - 23-00039-00-FP

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents