Similar Projects
Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Bidding
North Palm Beach, FL

Shore Protection Project (SPP) Mid-Town Segment and Phipps Ocean Park (Reach 7) Beach Renourishment 2019
Post-Bid
$10,000,000 to $25,000,000 est. value
Palm Beach, FL 33404

Lake Okeechobee S-191 Basin Surface Runoff Phosphorus Removal Using Innovative Technologies
Post-Bid
Less than $3,000,000 est. value
West Palm Beach, FL 33401

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Shore Protection Project Jupiter Carlin Segment Beach Renourishment, Palm Beach County, Florida
Results
$10,000,000 to $15,000,000 est. value
Jupiter, FL

Osceola Park Neighborhood Improvements (Phase II)
Post-Bid
Delray Beach, FL

CEPP New Waters STA-2 Distribution Canal Clearing, Grubbing and Muck Removal
Results
$2,532,000 to $2,799,000 est. value
West Palm Beach, FL 33406

Original Section Drainage Improvements Phase 7
Post-Bid
$250,000 est. value
Greenacres, FL 33463

Construction and Installation of a Fully Functional Culvert Outfall System within the Lake Worth Drainage District E-1W-S Canal
Results
Delray Beach, FL 33484

SE 8th Court Drainage Improvements
Post-Bid
$220,431 est. value
Delray Beach, FL

Osceola Park Neighborhood Improvements (Phase 1)
Results
Less than $5,000,000 est. value
Delray Beach, FL 33444

Shore Protection Project (SPP), North Boca Raton Segment, Beach Renourishment 2019, Palm Beach County, Florida
Results
$8,000,000 to $14,000,000 est. value
Palm Beach, FL

Stormwater Retaining Wall and Drainage Improvements
Results
FL 33469

Original Section Drainage Improvements Phase 6
Results
Greenacres, FL 33463

STA-1E Western Flow-Way Modifications - Imported Soil
Results
Less than $30,000,000 est. value
West Palm Beach, FL 33406

Last Updated 08/05/2020 08:21 AM
Project Title

Wildflower Sewall Replacement

Physical Address View project details and contacts
City, State (County) Boca Raton, FL 33432   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the installation of a king pile / concrete panel seawall within 18 inches in front of an existing seawall. The existing seawall will need to be partially removed to allow for the installation of the new wall. The seawall is located at the former Wildflower property located at 551 East Palmetto Park Road. The seawall is located on the eastern portion of the property adjacent to the Atlantic Intracoastal Waterway in the City of Boca Raton. The specific items of work include verification/location of existing conflicting utilities, removal of existing materials, installing 18” square prestressed concrete piles (vertical and batter), and installing 8” thick concrete sheet panels/piles and concrete seawall cap.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents