Similar Projects
Augusta Bunton Pump Force Main
Bidding
$650,000 est. value
Willis, MI 48191

Barton Pump Station Valve Improvement Project
Infrastructure
Bidding
$9,000,000 est. value
Ann Arbor, MI 48103

WWTP Wet Weather Storage Tank
Post-Bid
Whitmore Lake, MI 48189

Multiple Blocks - Student Publications - Replace Water Service to Building Jenny Lessard
Post-Bid
Ann Arbor, MI 48109

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Michigan Avenue at Paint Creek Water Main Rehabilitation
Results
Ypsilanti, MI

2022 Valve Replacement Project
Alteration
Bidding
Ann Arbor, MI

4610--Reverse Osmosis Equipment PM
Post-Bid
Ann Arbor, MI 48105

Dunmore, Waverly, Weldon, Hartford Water Main Replacement Project
Results
Ann Arbor, Hartford, Waverly, MI

2nd Street Water Main and Sidewalk
Infrastructure
Bidding
Dexter, MI 48130

Fire Hydrant Removal and Replacement
Post-Bid
Milan, MI

Geddes Road Water Main
Results
Ann Arbor, MI 48106

Chemistry and Dow Willard H Laboratory Potable and Non Potable Water Systems Pipe Repairs
Post-Bid
Ann Arbor, MI

Cross Street Water Infrastructure Improvements
Results
$1,414,139 est. value
Ypsilanti, MI

Gerstacker - Feed-Water System Replacement
Post-Bid
Ann Arbor, MI 48109

Reported 01/14/2022 12:00 AM
Project Title

Forcemain Maintenance and ARV Replacement

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI   (Washtenaw County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,050,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of work at two sites in two separate municipalities. Project Site 1 in Scio Township includes demolition of existing sewer force main structure and air release valve, temporary bypass piping, installation of new sewer vault with piping, and valving. Project Site 2 in the City of Ann Arbor includes installation of two new manhole structures on the sewer force main, temporary bypass piping, and installation of a new odor control system. Both locations require sewer cleaning and televising.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents