Similar Projects
PYP Centre Apron Expansion
Addition
Results
$449,000 est. value
Centre, AL 35960

Runway Safety Area Improvements
Renovation
Post-Bid
$1,300,000 to $1,600,000 est. value
Andalusia, AL 36421

Improvements to the Demopolis Regional Airport
New Construction
Post-Bid
Demopolis, AL

Isbell Field Airport Apron Rehabilitation
New Construction
Post-Bid
Fort Payne, AL 35968

Construction Manager at Risk - Terminal and Concourse Improvements Project
Renovation
Bidding
$2,000,000 est. value
Huntsville, AL 35824

Improvements to Ozark-Blackwell Field Airport
Construction
Ozark, AL 36360

MAA TSA Remodel
Renovation
Post-Bid
Mobile, AL 36608

Mobile Downtown Airport International Terminal
New Construction
Conception
$62,000,000 est. value
Mobile, AL 36615

Construction of a New Wash Rack
New Construction
Post-Bid
$580,000 est. value
Mobile, AL 36615

Site Development and Construction of East Terminal Building at H.L. "Sonny" Callahan Airport
New Construction, Infrastructure
Post-Bid
Fairhope, AL 36532

Bus Shelter Stop Pad Installation and Related Maintenance
Term Contract
Post-Bid
Birmingham, AL

Design/Build Services for New Receiving Building
New Construction - 6,000 SF
Results
Less than $100,000 est. value
Birmingham, AL 35212

Checked Bags Resolution Area Expansion
Addition
Post-Bid
Birmingham, AL 35212

Reported 05/18/2022 12:00 AM
Project Title

Mobile Downtown Airport Terminal Apron Reconstruction Phase 1 BP-3

Physical Address View project details and contacts
City, State (County) Mobile, AL 36615   (Mobile County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,326,000 [brand] Estimate
Plans Available from Agency's Affiliate - 04/18/22
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the full depth concrete apron reconstruction and associated drainage improvements at the Mobile Downtown Airport in Mobile, AL. The scope of work generally includes the installation of approximately 15,000 SYD of 16-inch Portland cement concrete pavement on a 6-inch lean concrete base course and select fill material, removal of existing concrete apron pavement, airfield drainage improvements, pavement marking removal and installation, and all associated erosion and sedimentation control measures.

Details

Airline/Passenger Terminal, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents