Similar Projects
J Avenue Filter Building Roof Replacement - City of Cedar Rapids
Alteration
Conception
$1,250,000 est. value
Cedar Rapids, IA 52402

Cryo Plant Improvements - 6150058 - City Of Cedar Rapids
Renovation
Conception
$3,000,000 est. value
Cedar Rapids, IA 52401

Janitorial Service for Water Treatment Plant
Term Contract
Sub-Bidding
Cedar Rapids, IA 52402

Marion Public Services Maintenance Facility Metal Roof Replacement
Alteration
Post-Bid
$718,000 est. value
Marion, IA 52302

Marion Public Services Building Single Ply Roof Overlay
Alteration
Post-Bid
$452,000 est. value
Marion, IA 52302

2021 College Community Roof Improvements
Alteration
Results
$630,000 est. value
Cedar Rapids, IA 52404

Bever Park Duck House Roof
Alteration
Results
Cedar Rapids, IA 52403

Clarifier Rehabilitation - D2 - City of Cedar Rapids
Renovation
Conception
$900,000 est. value
Cedar Rapids, IA

Kennedy High School Roof Improvements
Alteration
Results
$280,000 est. value
Cedar Rapids, IA 52402

2022-23 Taft Middle School Roof Improvements
Term Contract
Results
$790,000 est. value
Cedar Rapids, IA 52405

Echo Hill and Novak Elementary School Roof Improvements
Alteration
Results
Marion, IA 52302

Learning Resource Center Roof Improvements
Alteration
Results
Marion, IA

Bowman Woods Elementary School Roof Improvements
Alteration
Results
Cedar Rapids, IA 52402

WPCF Final Lift Roof Replacement
Alteration
Results
$210,000 est. value
Cedar Rapids, IA 52403

Water Pollution Control Facility - Final Lift Roof Replacement
Alteration
Results
$210,000 est. value
Cedar Rapids, IA 52403

Last Updated 08/08/2022 10:31 AM
Project Title

J Avenue Water Treatment Plant Lime Silo Dust Collector and Roof Improvements

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA 52402   (Linn County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Roofing, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $385,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work generally consists of replacement of existing dust collector, roofing system, lime fill piping, and railing with new; installation of a second new dust collector, new gravity roof ventilator, and compressed air piping; and electrical serving the new equipment. Items included in the Project are exempt from State of Iowa and Local Option Sales and Use Taxes. Contractor is responsible for obtaining the exemption or for applying for reimbursement for such taxes paid. Sales and Use taxes shall not be included in the Bid. The City of Cedar Rapids seeks to enhance worker safety by creating workplaces that are free of drugs and substance abuse. All contractors and subcontractors shall be responsible for pre-employment drug screening of prospective employees. All contractors and subcontractors shall have in place a drug and alcohol testing policy that conforms to the requirements of Iowa Code and will be required to submit with their Bid an affidavit attesting to this practice. The City Council of the City of Cedar Rapids reserves the right to reject any and all bids, to waive informalities and technicalities, and to enter such contracts as it deems in the best interest of the City. The City reserves the right to defer acceptance of any proposal for 45 calendar days after the bids have been received and opened.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Special Exhaust Systems, Dust Collection Systems.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents