Similar Projects
Annual Contract/Painting and Weatherproofing
Term Contract
Bidding
FL

Palm Beach County Sheriff's Office Exterior Hardening
Post-Bid
West Palm Beach, FL

CM-at-Risk Services - Architecture Building Exterior Envelope Repair
Post-Bid
Less than $5,000,000 est. value
Gainesville, FL

Sunshade Structure - EPA Gulf Breeze, FL
Results
Gulf Breeze, FL 32561

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Results
Less than $700,000 est. value
Fort Lauderdale, FL

UCF Downtown/Dr. Phillips Academic Commons
Construction
$66,000,000 est. value
FL

Lee County Downtown Jail Corridor Ceiling Replacement
Construction
Fort Myers, FL 33901

54--Building Roof Top Guardrail System
Post-Bid
Panama City, FL 32407

TGK Facility Re-Roof - Pressure Wash and Seal Exterior Building
Results
Less than $3,350,000 est. value
FL

Awning Repair, Recover and Install
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34235

N--Service: Recover Awnings Building 2 and 42
Results
Tampa, FL 33612

Exterior Painting Projects for Vernon E. Hargray Youth Enrichment Center and Sunset Lakes Community Center
Post-Bid
Miramar, FL 33025

UCF Spectrum Stadium Rust Remediation
Results
Orlando, FL 32816

Gutter Replacement
Post-Bid
Palm Harbor, FL 34683

Facility Maintenance Services for Cecil Airport
Results
Jacksonville, FL 32221

Last Updated 04/30/2020 01:45 PM
Project Title

Wildwood City Hall Annex Exterior Renovation

Physical Address View project details and contacts
City, State (County) Wildwood, FL 34785   (Sumter County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $242,196
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Project includes: A) Replacing windows and putting a brick veneer and stucco finish on the exterior (some of the existing windows are being blocked up, and others are to be replaced with glass block); B) Demolition of the north wall and replacement with CMUs and installation of new windows and doors in new locations; C) Adding a new roof over the existing flat roof; D) Painting of stucco and trim; and E) Installation of new guardrail at the existing loading dock.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents