Similar Projects
Bridge Rehabilitation - TH 169
Infrastructure
Conception
$17,000,000 CJ est. value
Princeton, MN 55371

Bridge Rehabilitation - TH 169
Infrastructure
Conception
$17,000,000 CJ est. value
Princeton, MN 55371

Resurfacing - TH 47
Infrastructure
Design
$6,400,000 CJ est. value
Isle, MN 56342

Resurfacing - TH 47
Infrastructure
Design
$6,400,000 CJ est. value
Isle, MN 56342

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water and Wastewater System Improvements - Water Meter System
Infrastructure
Post-Bid
Isle, MN

Snow Plowing/Removal Services
Term Contract
Post-Bid
Onamia, MN 56359

CSAH 14 Reconstruction
Results
$2,314,425 est. value
Foreston, MN

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

2023 Road Improvements Princeton Township
Infrastructure
Bidding
Princeton, MN 55371

Mille Lacs Kathio New Waterline
Infrastructure
Post-Bid
Onamia, MN 56359

Design Replace Building 22 Pipe RTC-Brainerd
Renovation, Infrastructure, Alteration
Results
Brainerd, MN

2023 Road Grading Season
Infrastructure
Bidding
$159,000 CJ est. value
Princeton, MN 55371

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Last Updated 03/15/2023 01:04 AM
Project Title

Cable Median Barrier Installation, Access Modification, Drainage Repair

Physical Address View project details and contacts
City, State (County) Princeton, MN 55371   (Mille Lacs County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $4,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

TH 19 in Blakely Twp to TH 25--cable median barrier installation, access modification, drainage repair. As of March 15, 2023, the project is in Final Planning status. Anticipated letting date is June 09, 2023. MNDOT - Cable Median Barrier Installation, Access Modification, Drainage Repair *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents