Similar Projects
Water Treatment Plant Rooftop Unit Replacements
Bidding
Bloomington, MN

2021 Concourse B Heating Upgrades P1
Renovation
Bidding
Minneapolis, MN

HVAC Filters
Term Contract
Post-Bid
Anoka, MN 55303

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

HVAC Upgrades
Results
Minneapolis, MN 55411

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

JSAW Health Club
Build-Out - 7,241 SF
Construction
Bloomington, Minneapolis, MN 55439

2021 Terminal 2 Preconditioned Air Units Replacement
Bidding
MN 55111

HVAC and Mechanical Products
Term Contract
Post-Bid

Madison Elementary School HVAC Replacement and Deferred Maintenance - Phase 2
Results
Blaine, Minneapolis, MN 55434

Boiler Burner Replacement and Cooling Tower Recondition at Anoka Metro Regional Treatment Center
Bidding
$300,000 est. value
Anoka, MN 55303

Hennepin County Public Works -CMED Cooling
Post-Bid
Medina, MN 55340

Monroe Elementary School HVAC Replacement and Deferred Maintenance - Phase 3
Results
Anoka, MN

Wayzata Oakwood Elementary Kitchen HVAC Replacement
Bidding
Plymouth, MN 55447

J041--Chiller Maintenance 36C26318f0324 - 618C00184 - (Va-21-00015466)
Post-Bid
Minneapolis, MN

Last Updated 04/09/2021 10:44 AM
Project Title

Braemar Ice Arena Dehumidification Upgrade

Physical Address View project details and contacts
City, State (County) Edina, Minneapolis, MN (Anoka, Hennepin Counties)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Athletic Facility, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $240,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation, coordination, and maintenance of a temporary dehumidification unit (DHU). The cost of renting the unit will be paid for by the City, all other costs associated with the temporary DHU are to be paid for by the contractor. The project consists of the removal of the existing DHU, and installation of a new DHU along with associated power, controls, ductwork, supports, roof patching, and miscellaneous equipment removal and site work to support the new DHU install. Controls are to be upgraded to a new building automation

Details

Athletic Facility, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents