Similar Projects
Last Updated | 12/08/2023 03:12 PM |
Project Title | Oliveira Apartments at Fire Alarm Control Equipment Panal Replacement |
Physical Address | View project details and contacts |
City, State (County) | Fall River, MA 02721 (Bristol County) |
Category(s) | Single Trades |
Sub-Category(s) | Fire Protection |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $72,483 [brand] Estimate |
Plans Available from | Civil Engineer - 11/15/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace existing fire alarm control equipment with new at the Oliveira Apartments for the Fall River Housing Authority. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Project consists of: replace existing fire alarm control equipment with new. The observation is an opportunity to visit and observe the site only. Any oral interpretations offered at the site inspection are non-binding. Any questions must be submitted in writing to the Designer, at the e-mail address on the Project Manual cover, no later than 4:00 PM on the Friday prior to the date stated above for the receipt of bids. Questions after that time may not be responded to, at the sole discretion of the designer. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |