Similar Projects
Summerville Prepatory Academy
New Construction - 43,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Summerville, SC 29485

New Middle School Construction
New Construction
Conception
$52,111,279 est. value
Greer, SC 29651

Irmo High School New East Wing
New Construction, Renovation - 96,000 SF
Design
$44,000,000 est. value
Columbia, SC 29212

Byrnes High School Renovation and Addition
Renovation, Addition
Design
Duncan, SC 29334

Furnish, Deliver, and Install Ground Level Storage Container for River Bluff High School
Infrastructure
Bidding
$250,000 CJ est. value
Lexington, SC 29072

Construction of Dugouts and Other Field Improvements for Blacksburg High School Softball Facility
Infrastructure
Bidding
$1,700,000 CJ est. value
Blacksburg, SC 29702

Various Renovations to Florence 1 Schools FY21-22 (No.1)
Renovation
Post-Bid
Effingham, Florence, SC 29501

Additions/Renovations - Richland Northeast High
Renovation, Addition
Post-Bid
Columbia, SC 29223

New Middle School
New Construction
Results
$35,000,000 est. value
Summerville, SC 29483

Ridge View High School Renovations
Renovation - 9,950 SF
Results
Columbia, SC 29229

Georgetown Middle School Renovation
Renovation
Construction
Less than $6,500,000 est. value
Georgetown, SC 29440

New West Ashley Center for Advanced Studies
New Construction - 100,000 SF
Construction
Charleston, SC 29414

2022 Bond - Orangeburg County Schools
New Construction, Renovation, Infrastructure
Pending Verification
$190,000,000 CJ est. value
Holly Hill, SC 29059

Summerville Preparatory Academy
New Construction, Infrastructure - 42,900 SF
Pending Verification
$8,400,000 CJ est. value
Summerville, SC 29485

Beech Springs School Renovation and Addition
Renovation, Addition
Conception
Duncan, SC 29334

Last Updated 10/24/2022 10:23 AM
Project Title

Williamsburg County School Renovations

Physical Address View project details and contacts
City, State (County) Kingstree, SC 29556   (Williamsburg County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of 10/24/2022, this project has been canceled. Renovations to Kingstree High School including new cabinetry for Culinary arts and Cosmetology Lab, new flooring, painting, new modular classroom roof, new HVAC.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents