Similar Projects
Pierpont - Maben Rd
Infrastructure
Design
$1,000,000 est. value
Slab Fork, WV 25920

Mullens - Pierpont Rd
Infrastructure
Design
$1,050,000 CJ est. value
Slab Fork, WV 25920

Appalachian Regional Healthcare (ARH) - OR RTU Replacement
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Beckley, WV 25801

Kroger Fuel Center #770 / Beaver
New Construction, Infrastructure - 885 SF
Bidding
$550,000 CJ est. value
Beaver, WV 25813

East Main Street Milling and Paving
Infrastructure
Post-Bid
Beckley, WV 25801

I-77 - Airport Road
Infrastructure
Post-Bid
$5,800,000 est. value
WV

Surveyor - Crab Orchard
Infrastructure
Results
WV

Highway Pollinator Mitigation Site Development and Maintenance
Term Contract, Infrastructure
Results

New Beckley Travel Plaza - West Virginia Parkways Authority
Demolition, New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Beckley, WV 25801

Harper Rd Ada Ramps +3
Infrastructure
Design
$918,000 CJ est. value
Beckley, WV 25801

Paving of Scott Avenue Basketball Court
Infrastructure
Post-Bid
$300,000 est. value
Beckley, WV 25801

Shady Spring Elementary School Access Road
Infrastructure
Results
Shady Spring, WV 25918

Little Beaver - Airport Road
Infrastructure
Design
$800,000 CJ est. value
Beaver, WV 25813

EHRM Infrastructure Upgrades Design Beckley, WV VAMC
Infrastructure, Renovation
Post-Bid
$20,000,000 CJ est. value
Beckley, WV 25801

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Last Updated 01/04/2023 07:05 AM
Project Title

Corridor L BR No 2 EB and WB

Physical Address View project details and contacts
City, State (County) Beckley, WV 25801   (Raleigh County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected December 2024
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : NHPP0019495D Type of Work : Rehab As of January 04, 2023, the project is in Design status. The funding obligation date for the construction is August 28, 2024. WVDOT - Corridor L BR No 2 EB and WB *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents