Similar Projects
Lake Huron Environmental Sciences Research Station - Saginaw Valley State University
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Saginaw, MI 48604

Hemlock Public School District Middle School - Remaining 2022 Bond Work
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Hemlock, MI 48626

MUNI - Knowles Drive Phases 2 & 3 / Longhorn Road - Kimley-Horn and Associates, Inc
Infrastructure
Design
$640,000 CJ est. value
Saginaw, MI 48638

Hot Mix Asphalt Reconstruction, Concrete Curb, Gutter, Sidewalk and Ramps, Signing, Drainage and Pavement Markings on 17th Street
Infrastructure
Bidding
$1,870,000 CJ est. value
Saginaw, MI 48601

Cold Milling HMA Surface, HMA Paving and Pavement Markings M-46 Elm Street to Williams Street
Infrastructure
Bidding
$2,143,000 CJ est. value
Saginaw, MI 48638

Swan Valley Schools - Shields And Havens Additions
Addition
Post-Bid
$1,500,000 est. value
Saginaw, MI

Village of Birch Run Phase III Streetscape
Infrastructure
Post-Bid
$2,700,000 CJ est. value
Birch Run, MI 48415

Concrete Repairs on Primary Settling Tank #4 at Waste Water Treatment Plant
Infrastructure
Results
$98,800 CJ est. value
Saginaw, MI 48601

Saginaw City School District - Zilwaukee Elementary School Mechanical Revisions
Renovation
Results
$1,762,000 CJ est. value
Saginaw, MI 48604

Bridge Rehabilitation Including Epoxy Deck Overlay, Deck Patching and Sidewalk Repairs on Johnson Street
Demolition, New Construction, Infrastructure
Construction
$538,995 CJ est. value
Saginaw, MI 48607

Shields Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Shields Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Athletic Facility, Interior Improvements and Boiler Replacement BP1C
Renovation - 6,028 SF
Post-Bid
$1,500,000 est. value
Saginaw, MI

Jessie Rouse Elementary School Mechanical Revisions
Renovation
Results
$1,262,000 CJ est. value
Saginaw, MI 48601

Havens Elementary School - 2021 Bond - Swan Valley School District
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Saginaw, MI 48609

Last Updated 08/24/2023 02:12 PM
Project Title

Swan Valley Havens Elementary - Fence Improvements

Physical Address View project details and contacts
City, State (County) Saginaw, MI 48609   (Saginaw County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $32,575 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given that the Swan Valley School District is receiving bids from trade contractors for the following project: SWAN VALLEY SHIELDS ELEMENTARY - FENCE IMPROVEMENTS. Bids may not be withdrawn for a period of sixty (60) days after the bid date. Proposals should be submitted in TRIPLICATE and be addressed to: Mat McRae - Superintendent Swan Valley School District 8380 O'Hern Road Saginaw, MI 48609 The Owner reserves the right to reject any, part of any or all bids and to waive all informalities in the bidding procedures. The Owner reserves the right to reject any bid when Bidder fails to submit data required by the Bidding Documents, or if the bid is submitted incomplete or irregular. No telephonic, telegraphic, email, fax bids or modification to a submitted bid will be received or considered by the Owner. BID BONDS Each bid that exceeds Fifty Thousand Dollars ($50,000) must be submitted with an attached certified check or bid bond from a surety company approved to do business in the State of Michigan, payable to the Owner in an amount not less than five percent (5%) of the base bid. PRE-BID CONFERENCE None scheduled. A site visit can be arranged through jdoyle@swanvalley.k12.mi.us.. SCHEDULE Project may begin on April 24, 2023 and must be complete by June 30, 2023. QUESTIONS / RFI's All questions regarding the plans and specifications are to be emailed to Jim Doyle Director of Facilities (jdoyle@swanvalley.k12.mi.us). Questions regarding bidding procedures are to be emailed or you may call Jim at (989) 921-3701.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents