Similar Projects
Z2NE--NRM PLUS UP; (PROJ: 546-19-102) BB CONST; Upgrade Water Mains Building 1
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Miami, FL 33125

Correct Water Intrusion, JL King Justice Bldg, Miami
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Miami, FL 33132

PS 9 - Cravero Pump Station Force Main Replacement
Infrastructure
Bidding
$350,000 est. value
North Miami Beach, FL 33162

Master Pump Station 4 Force Main Re-Routing (SEWR2002)
Renovation, Infrastructure
Bidding
$1,479,000 est. value
Miami Gardens, FL 33056

Design-Build Services for a 54-Inch Diameter Water Transmission Main
Post-Bid
Less than $32,398,000 est. value
Miami, FL 33128

Testing, Maintenance and Certification of Backflow Preventers
Post-Bid
Miami, FL 33010

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

60-Inch Force Main (NL-1A) between the Intersections of NE 151 Street and Biscayne Boulevard and NE 163 Street and NE 8 Avenue
Results
Less than $23,960,532 est. value
North Miami Beach, FL 33162

BB Upgrade Water Mains Building 1
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
Miami, FL 33125

Weekly Septic Cleanout
Post-Bid
Homestead, FL 33030

2020 General Utility Repairs
Results
Medley, FL 33166

Septic Services
Term Contract
Post-Bid
Miami, FL

60-Inch Force Main (NL-1A) (West Segment) along Northwest 162 Street from Northwest 6 Avenue to Northwest 8 Avenue
Results
Less than $21,954,755 est. value
Miami, FL 33169

Trenchless Pipe Installation and Pipe Rehabilitation Services
Post-Bid
FL

Potable Water Main Improvements Phase 1 Sylvania Boulevard from SW 9th Street to SW 57th Avenue and SW 58th Avenue from SW 9th Street to SW 15th Street and SW 9 Terrace from Sylvania Boulevard to SW 58 Avenue
Results
Less than $1,500,000 est. value
West Miami, FL 33144

Reported 01/21/2022 12:00 AM
Project Title

NW 27 Avenue Waste Collection Transmission System Expansion and Water Distribution System Improvements

Physical Address View project details and contacts
City, State (County) Miami, FL 33106   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $4,532,993
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of approximately 7,984 linear feet (LF) of a new Gravity Sewer system (based on approximately 3,133 LF of 8-inch Polyvinyl Chloride (PVC) gravity sewer mains and fittings, 160 LF of 8-inch Ductile Iron (DI) gravity sewer mains and fittings, 2,632 LF of 10-inch PVC gravity sewer mains and fittings, 306 LF of 12-inch PVC gravity sewer mains and fittings and 1,753 LF of 16-inch PVC gravity sewer mains and fittings) along with installation of 59 sewer lateral connections (Approximately 1,987 LF of 6-inch PVC sewer lateral mains and fittings and 38 LF of 6-inch DI lateral mains and fittings) and 26 manhole structures along NW 27th Avenue, between NW 107th Street and NW 123rd Street, and including the following adjoining streets: NW 123rd Street, NW 119th Street, NW 118th Street, NW 115th Street, and W Golf Drive. The installation along NW 27th Avenue and NW 119th Avenue falls within the Florida Department of Transportation's (FOOT) Right-of-Way, requiring coordination with FOOT to obtain the appropriate permits for construction. The work includes but is not limited to furnishing all materials, labor, and equipment necessary for the installation of the gravity sewer mains, sanitary laterals and connections thereof, including the installation of new sanitary manhole structures separated no more than 400 feet apart as shown in the plans; relocating two (2) existing 15-inch concrete storm drainage pipes and coordination with the Department for the relocation of one (1) 12-inch ductile iron water main in conflict with the proposed sanitary sewer alignment as shown in the contract documents (the Department to perform water main relocation work); providing protective measures due to petroleum contamination for approximately 100 LF along NW 27th Avenue as specified in the contract documents including: providing ductile iron pipe (DIP) in lieu of PVC pipe with protective polyethylene encasement, Viton gaskets, and trench liner (see Appendix K for the Department's Environmental Due Diligence Review for additional information); and coring an existing manhole located at the intersection of W Golf Drive and NW 115th Street to accept a 16-inch PVC gravity sewer in accordance with WASD Detail SS 6.2. Work includes, as well, cleaning and testing of the proposed gravity sewer lines, providing, and implementing Maintenance of Traffic (MOT) plans, providing off-duty police for traffic control as per the requirements of the Department or governing authorities, temporary and permanent pavement restoration, full width milling, and asphalt overlay of existing roadways as shown in the contract documents and replacing pavement markings. Pre-Bid meeting Information - Email Paul.Adams@MiamiDade.gov, cc to the Clerk.Board@miamidade.gov if you want a TEAMS invitation sent to you.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents