Similar Projects
Babbitt Ranch Solar and Storage
New Construction, Infrastructure
Conception
$98,000,000 CJ est. value
Williams, AZ 86046

Babbitt Ranch Wind
New Construction, Infrastructure
Conception
$39,500,000 CJ est. value
Williams, AZ 86046

Northern Arizona Healthcare Flagstaff Medical Center Expansion
Addition, Demolition, Infrastructure
Design
$800,000,000 CJ est. value
Flagstaff, AZ 86001

AutoZone #2782 / Flagstaff
New Construction, Infrastructure - 8,000 SF
Design
$1,500,000 CJ est. value
Flagstaff, AZ 86004

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Segmented Circle Relocation Project
Infrastructure
Bidding
$200,000 CJ est. value
Page, AZ 86040

GRCA 190083 - Improve Potable Water Supply to Innercanyon and South Rim, Transcanyon Water Distribution Pipeline, Grand Canyon National Park
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Grand Canyon, AZ 86023

GRCA 190083 - Improve Potable Water Supply to Innercanyon and South Rim, Transcanyon Water Distribution Pipeline, Grand Canyon National Park
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Grand Canyon, AZ 86023

Drainage and Sediment Control
Infrastructure
Results
$12,462,000 est. value
AZ

Drainage Improvements FY 22 Phase 1
Infrastructure
Results
Page, AZ

Shadow Mountain Drive Hotel Remodel
Build-out, Infrastructure
Pending Verification
$600,000 CJ est. value
Bellemont, AZ 86015

Kachina Trail Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Flagstaff, AZ 86001

Holiday Inn / Flagstaff
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Flagstaff, AZ 86004

Babbitt Ranch Solar and Storage
New Construction, Infrastructure
Design
$98,000,000 CJ est. value
Williams, AZ 86046

Fredonia Street Lighting Improvements
Infrastructure
Bidding
$356,000 CJ est. value
Fredonia, AZ 86022

Last Updated 03/16/2023 03:12 PM
Project Title

City of Page Drainage Improvements FY23

Physical Address View project details and contacts
City, State (County) Page, AZ 86040   (Coconino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $855,309 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 16, 2023, project was awarded to B4 Enterprises, awarded amount is $855,309.43. The City of Page, Arizona is seeking bids from qualified contractors for construction of stormwater drainage The City of Page Phase 2 Drainage Improvements. The work consist of repair, and improvement of existing drainage culverts located at Haul and Newburn Rd, within the City of Page boundaries. MANDATORY PRE-BID MEETING. Pre-Bid meeting on February 9th , 2022, at 1:30pm at City Hall, 679 Vista Avenue, Page Arizona 86040 Questions and requests for additional specifications and/or bid documents shall be directed to: Kyle Christiansen, Director of Public Works, City of Page, PO BOX 1180, Page, Arizona 86040, 928-645-4302. RFB packages may also be accessed on the City of Page website. Persons with disabilities may call the City's Human Resources Director at (928) 645-4231 or text telephone (TDD) (928) 645-4216 regarding availability of information in alternative formats. All bid must be accompanied by a bond or a cashier's check of the company, drawn on a national bank, in an amount equal to ten percent (10%) of the Bid amount, as a guarantee on the part of the Bidder that it will, if called upon to do so, accept and enter into a contract based on the obligations and conditions set forth in the Bid Documents. The successful Bidder, prior to entering into the contract, shall file with the City a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price, a Performance Bond in an amount equal to one hundred percent (100%) of the Contract price, and a certificate of Insurance. Bids may not be withdrawn for a period of sixty (60) days after the bid opening. The City of Page reserves the right to reject any or all bids or parts thereto and to waive any informality in the bids received.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents