Similar Projects
Millspring Village Subdivision
New Construction, Infrastructure
Conception
$44,000,000 CJ est. value
Greenville, SC 29617

Laurens Road Swamp Rabbit Trail (SRT) - City of Greenville
Infrastructure
Conception
$1,500,000 est. value
Greenville, SC 29613

The Alliance
New Construction, Infrastructure - 33,000 SF
Design
$15,000,000 CJ est. value
Greenville, SC 29607

The Alliance
New Construction, Infrastructure - 33,000 SF
Design
$15,000,000 CJ est. value
Greenville, SC 29607

Safety Improvements - Sc 146 (Greenville Co)
Infrastructure
Bidding
$1,600,000 CJ est. value
Simpsonville, SC 29681

Safety Improvements - Sc 146 (Greenville Co)
Infrastructure
Bidding
$1,600,000 CJ est. value
Simpsonville, SC 29681

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Post-Bid
$600,000 CJ est. value
Greer, SC 29651

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Post-Bid
$600,000 CJ est. value
Greer, SC 29651

Site Grading at 113 Leesburg Peak
Results
Greer, SC 29651

Safety Improvement at S-279
Infrastructure
Results
SC

BridgeWay Station Mixed-Use / Mauldin
New Construction, Infrastructure - 300,000 SF
Construction
$100,000,000 CJ est. value
Simpsonville, SC 29681

Ford Street Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Greer, SC 29650

Ford Street Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Greer, SC 29650

Verdae Swamp Rabbit Trail (SRT) Underpass - City of Greenville
Infrastructure
Conception
Less than $2,000,000 est. value
Greenville, SC 29601

Repave Basketball Court, Needmore Center
Infrastructure
Design
$32,000 CJ est. value
Greer, SC 29650

Last Updated 09/16/2022 04:07 PM
Project Title

Zoo Walkway Repaving - City of Greenville

Physical Address View project details and contacts
City, State (County) Greenville, SC 29601   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $366,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Zoo Walkway Repaving ($366,500 total project cost) - This one-time project will repave approximately one mile of walkways through the zoo to maintain a safe and beautiful environment for guests. This project is in included in the City of Greenville FY 2022-23 Capital Improvement Plan (CIP). As of September 16, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents