Similar Projects
Heating System Repair and Replacements
Renovation
Design
$2,000,000 CJ est. value
Hartford, WI 53027

2023 Riverside Rail Corridor Soil Disposal Project
Infrastructure
Sub-Bidding
$560,000 CJ est. value
Wausau, WI 54403

Clean-up of an area at 6237 N. Hopkins St
Term Contract
Sub-Bidding
Milwaukee, WI 53209

Asbestos, Lead-Based Paint And Hazardous Materials
Renovation
Post-Bid
Milwaukee, WI 53224

Asbestos Abatement and Disposal Services
Infrastructure, Alteration
Post-Bid
Milwaukee, WI

Capital High Fall 2022 Abatement/Demolition
Demolition, Alteration
Results
Madison, WI 53705

Port Edwards High School Science Lab Asbestos Abatement
Alteration
Results
Port Edwards, WI 54469

Dormitory Abatement and Demolition
Term Contract, Demolition, Infrastructure
Construction
$1,138,000 CJ est. value
Eau Claire, WI 54701

Convert Vehicle Storage Bays to Heated Workspace
Renovation
Construction
$112,090 CJ est. value
Delafield, WI 53018

2023 Fiber Optic Connections
Infrastructure
Sub-Bidding
$400,000 CJ est. value
South Milwaukee, WI 53172

East High School Asbestos Abatement and Interior Demolition
Renovation, Infrastructure, Alteration
Post-Bid
Madison, WI 53704

La Follette Asbestos Abatement and Interior Demolition
Demolition, Alteration
Results
Madison, WI

Fuel Storage Tank Demolition
Demolition, Infrastructure
Construction
$37,135 CJ est. value
Wausau, WI 54401

Battery Energy Storage System Installation and Integration with Solar PV System
Renovation
Sub-Bidding
$90,000 CJ est. value
Washburn, WI 54891

Engineering Services - Hvac System Improvements In Buildings 378 And 380 At South Shore Water Reclamation Facility
Term Contract, Alteration
Post-Bid
Milwaukee, WI

Last Updated 04/17/2023 03:07 PM
Project Title

2023 Upper Nemahbin Lake Dredging Project

Physical Address View project details and contacts
City, State (County) Summit, WI 53066   (Waukesha County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Environmental Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Remove approximately 11,000 cubic yards of sediment by a hydraulic dredging operation. The dredged material will be pumped into geotubes , located on adjacent private property, to dewater. Once dewatered the material will be removed and transported to the Village of Summit Park and land spread on an existing farm field. The private lots will be restored to original grade and conditions The project is permitted by the WDNR, IP-SE-2022-68-03658, and allows the dredging operations to be conducted between June 15 and October 15. The removal and disposal of the sediment may occur outside that time limitation.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents