Similar Projects
OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive
Infrastructure, Alteration
Design
$20,000,000 est. value
Klamath Falls, OR 97601

2022 Seal Coat Liquid Roads Ultra Project
Term Contract
Bidding
$100,000 est. value
Redmond, OR

OR569: Green Hill Rd - Coburg Rd (Eugene) Section of the Beltline and Eugene-Springfield Highway (Rt. No. OR569 and I-105) in Eugene
Infrastructure
Bidding
$10,000,000 to $20,000,000 est. value
Eugene, OR

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Post-Bid
Hood River, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

US97: OR58 - California Border Project the Dalles-California Hwy Tom Feeley, Pm
Infrastructure
Results
OR

OR58: Salt Creek Tunnel to MP 70 Section of the Willamette Highway (Rt. No. OR58) Near Odell Lake
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

Bend WRF Paving Project
Demolition, Alteration
Bidding
$70,000 est. value
Bend, OR 97701

Granite Hill Road Reconstruction
Alteration
Post-Bid
$7,000,000 to $10,000,000 est. value
Sumpter, OR

US97 - Redmond - Bend Project the Dalles-California Hwy
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Redmond, OR

Landmark Drive Road Reconstruction
Alteration
Bidding
$800,000 est. value
Philomath, OR

Juniper Ridge Public Works Campus Project
Alteration
Post-Bid
Bend, OR

Last Updated 03/04/2022 01:11 AM
Project Title

I-84: Ladd Canyon-North Powder Section of the Old Oregon Trail Highway (Rt. No. I-84) in La Grande.

Physical Address View project details and contacts
City, State (County) La Grande, OR   (Union County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I-84: Ladd Canyon-North Powder Section of the Old Oregon Trail Highway (Rt. No. I-84) in La Grande. Req. approx. 770 hr training; 700 ft2 temp sign; 4 ea PCMS; 2 ea radar spd trail; 100 hr flag; 50 ea TCS; 12,000 ea pvmt marker; const remove roadbed and surf (33 yd3 exc; 35 ton aggr base; 66 ton asph mix); const surv work; 301,500 yd2 cold plane rem; 80 ton fog coat; 100 ton tack coat; 33,500 ton ACP (2,000 ton PG70-28ER); 3 ea core correlation; 500 yd2 ACP repair; 200 yd2 CRCP repair; 52 mile rumble strip; 315,000 ft pvmt marking high perfom; auto traffic recorder install

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents