Similar Projects
Stairwell Pressurization MEP
Alteration
Bidding
$987,000 est. value
Madison, WI 53706

Stairwell Pressurization GPC
Alteration
Bidding
$987,000 est. value
Madison, WI 53706

MEPF Design Assist for East, West and Capital High Schools
Alteration
Sub-Bidding
Madison, WI 53704

Ionization System Installation
Post-Bid
Lancaster, WI 53813

HVAC, Hot Water Heaters & Refrigerators
Term Contract
Post-Bid

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

HVAC Upgrade
Results
Less than $225,000 est. value
Madison, WI 53593

Fountain City Service Base HVAC Return Duct
Term Contract
Bidding
Less than $25,000 est. value
Fountain City, WI 54629

Emergency Furnace Replacements
Term Contract
Post-Bid
Wisconsin Dells, WI 53965

Kitchen Hood Replacement - MEP
Results
Less than $674,000 est. value
Menomonie, WI 54751

HVAC Hot Water Heaters and Refrigerators Installment
Term Contract
Post-Bid

Kitchen Hood Replacement - General
Results
Less than $674,000 est. value
Menomonie, WI 54751

Emergency Furnace Replacement
Term Contract
Post-Bid

Testing, Certification, Preventive Maintenance, and Repair Services for Fume Hoods, Clean Rooms, Biosafety Cabinets
Results
Appleton, WI

HVAC Upgrades for the Lake Mills High School Science Room and Math Room
Post-Bid
Lake Mills, WI 53551

Last Updated 07/22/2021 09:59 AM
Project Title

Building B Air Tempering - Phase 1 - GPC

Physical Address View project details and contacts
City, State (County) Oshkosh, WI   (Winnebago County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $364,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of existing heating and ventilation equipment serving wings B5 and B6; installation of a new packaged penthouse air handling units on the roof of wings B5 and B6; and installation of new supply air, return air and exhaust air distribution systems for wings B5 and B6. Supply air distribution includes new VAV reheat boxes. The existing hot water system will be extended to serve the existing VAV reheat coils and AHU preheat coils. The existing chilled water system will be extended to serve the AHU chilled water coils. Work includes new DDC control systems to support the new mechanical systems and system upgrades. New ceilings and LED lighting are being provided in Wings B5 and B6. General trades, electrical, plumbing and fire protection work will support the upgrades.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents