Similar Projects
Blazier Field Pressbox and Milburn Campus Concession Building
Renovation
Bidding
O'Fallon, IL

Multiple HVAC Improvements 2021 - Belle Alexander, Central, Irving, Lyle, and Neponset
Infrastructure
Bidding
Kewanee, Neponset, IL 61443

New Innovative Center & School Renovations
Renovation
Post-Bid
Carol Stream, IL 60188

North High School Master Facility Plan
Post-Bid
Downers Grove, IL 60515

McHenry High School West Campus Addition and Renovations
Renovation, Addition - 64,000 SF
Results
Less than $44,000,000 est. value
McHenry, IL 60050

Disney II Magnet HS Convent Building Tuckpointing
Results
Chicago, IL 60602

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

High School Gym Replacement at Argenta-Oreana High School
Addition - 16,187 SF
Construction
Less than $4,200,000 est. value
Argenta, IL 62501

Lincoln Middle School Chimney Demolition
Infrastructure
Bidding
Rockford, IL 61104

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

East Building Addition Phase II - Fitness Addition
Addition
Results
Lincolnshire, IL 60069

Additions and Renovations
Renovation, Addition
Bidding
Morton Grove, IL 60053

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Gym 1 Renovations and Think Lab at Lane Tech HS
Renovation
Results
Chicago, IL 60618

Central School Addition and Renovations
Renovation, Addition
Bidding
Lemont, IL

Last Updated 08/05/2021 01:00 PM
Project Title

Zeigler-Royalton High School Restrooms

Physical Address View project details and contacts
City, State (County) Mulkeytown, IL 62865   (Franklin County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to include the complete renovation of a storage room into two fully functioning single user restrooms. Work associated with the restroom renovation include, but is not limited to, the partial removal of the concrete slab, the complete demolition of the existing ACT assembly, and other associated items as well as the installation of new concrete infill, metal stud partitions, epoxy flooring and integral base, hollow metal door frames, wood doors, door hardware, lay-in acoustic ceiling assemblies, plumbing fixtures, toilet accessories, and wall paint. Corresponding Mechanical, Plumbing, and Electrical Systems will also be included.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents