Similar Projects
Last Updated | 01/02/2024 08:31 PM |
Project Title | CTH C/ Wilmot Road |
Physical Address | View project details and contacts |
City, State (County) | Bristol, WI 53142 (Kenosha County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected February 2024 |
Bids Due | View project details and contacts |
Estimated Value | $1,400,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description: Intersection improvements and installation of traffic signals at the intersection of CTH C/Wilmot Road and CTH U/136th Avenue. Project Category Code: Street/Road Intersection Improvements, Construction, Pedestrian Improvements, Sidewalks/Curbs/Gutters, Sawcutting/Sidewalk/Pavement, Excavation, Stormwater Improvements, Traffic Control Devices (Signals, Signing, etc.), Paving (Highway, Road or Street) After the opening, Kenosha County will email an As-Read/Apparent Bids List to all bidders by 12:00 p.m., Monday, January 30, 2023. Est. Completion Date: June 29, 2023 Pre-Qualification: Yes Pre-Bid Meeting Info: No All bidders must file a Bidders Proof of Responsibility Form with the Kenosha County Highway Commissioner on or before 3:00 p.m. on January 19, 2023 (Form PA-10). The form can be emailed to clement.abongwa@kenoshacounty.org. After the opening, Kenosha County will email an As-Read/Apparent Bids List to all bidders by 12:00 p.m., Monday, January 30, 2023. All bidders must file a "Bidders Proof of Responsibility Form" with the Kenosha County Highway Commissioner on or before 3:00 p.m. on January 19, 2023 (Form PA-10). The form can be emailed to clement.abongwa@kenoshacounty.org. Approximate quantities of work to be expected are as follows: CLEARING & GRUBBING STA 14 EXCAVATION COMMON CY 2,921 REMOVING ASPHALTIC SURFACE MILLING SY 5,690 BASE AGGREGATE DENSE TON 5,965 HMA PAVEMENT TON 2,825 CULVERT PIPES LF 104 CONCRETE CURB & GUTTER LF 590 CONCRETE SIDEWALK 4-INCH SF 1,435 STORM SEWER PIPE LF 284.6 INLETS EACH 5 RESTORATION SY 5,815 PERMANENT SIGNING SF 125.57 PAVEMENT MARKING 4-INCH & 8-INCH (PERMANENT & TEMPORARY) LF 35,330 SAWING ASPHALT LF 3,340 SIGNALIZED INTERSECTION EACH 1 Proposals are solicited by Kenosha County, hereinafter known as the Owner, for the CTH C/Wilmot Road at CTH U/136th Avenue Intersection Improvement Project in Kenosha County at the above-described locations. Prospective bidders should visit the sites of the proposed work which will be performed to familiarize themselves with the conditions prevailing at the locations where work will be performed. The work will include the furnishing of all labor, materials, equipment, tools, supplies, services, etc., required for the complete Intersection Improvement Project. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |