Similar Projects
Window Treatment
Alteration
Post-Bid
Ronkonkoma, NY 11779

Wall Covering
Alteration
Post-Bid
Oakdale, NY 11769

Interior Alteration of the Existing OTP Clinic
Alteration
Results
Hauppauge, NY 11788

Davis Homestead Plaster Repair
Alteration
Results
Middle Island, NY 11953

Recaulk North, East & West Sides
Term Contract
Post-Bid
Farmingdale, NY 11735

Roosevelt Community Facade and Stair Tower Repairs
Alteration
Results
Stony Brook, NY 11790

Annual Requirements Contract - Ceiling Tiles and Support Components
Term Contract, Alteration
Post-Bid
Yaphank, NY

Site, Interior, and Window Reconstruction at Hampton Bays High School
Alteration
Results
Hampton Bays, NY 11946

772 Hawkins Avenue Cmm Remove and Replace Sheetrock, Insulation and Flooring (Garage and Bedroom)
Alteration
Post-Bid
Lake Ronkonkoma, NY 11779

Demountable Walls
Alteration
Results
Centereach, NY

Center Moriches Library - Interior Alterations and New Gas Service
Alteration
Post-Bid
$400,000 est. value
Center Moriches, NY 11934

Prodell MS Toilet Room Reconstruction
Renovation
Results
Shoreham, NY 11786

Partition Repairs
Alteration
Post-Bid

District-Wide Ceiling and Lighting Replacements
Alteration
Post-Bid
$300,000 est. value
West Islip, NY

IPE Decking
Alteration
Post-Bid
Islip, NY

Reported 06/04/2022 12:00 AM
Project Title

Construction and Installation of 3 Climbing Routes on Existing Bouldering Wall

Physical Address View project details and contacts
City, State (County) Manorville, NY   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of 3 Climbing Routes on Existing Bouldering Wall. Provide all materials, equipment, labor and installation for three (3) climbing routes to be added/attached to the existing boulder wall at the Jr/Sr High School. Vendor must provide and use a scissor lift for approximately five (5) days in order to complete the routes. Materials and equipment to include, but not be limited to: o Three (3) climbing routes framed out on %" oak plywood to match existing bouldering wall o Three (3) - belay stations installed with backup o Ten (10) - 4x8 oak plywood o 30 (3) 2x4x8 Douglas Fir o Five-Hundred (500) -!4" T Nuts zinc plated o One-Hundred (100) - 3/8x3" hex bolts o Six (6) - 5/8x36" nut eye bolt o Fifty (50) - Hollow set drop in concrete anchor 'A" o One-Hundred (100) - Climbing Holds o One (1) - CMI shear reduction device o Six (6) - 5/8" Maillon Rapid quick links o One (1) Scissor Lift for approximately five (5) days

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents