Similar Projects
Sunny Dale Apartments Exterior Renovations
Renovation
Bidding
$430,000 CJ est. value
Burien, WA 98148

Whatcom County Courthouse Roof #10 and #22 Reroof
Renovation
Sub-Bidding
$400,000 CJ est. value
Bellingham, WA 98225

Install Building 109B Gutters
Renovation
Sub-Bidding
$25,000 CJ est. value
Pullman, WA 99164

Dirtworks Gazebo Roof Replacement project
Alteration
Post-Bid
Olympia, WA

Roof Replacement at Glenhaven Condominiums
Alteration
Post-Bid
Langley, WA 98260

Wallenstien Performing Arts Roof Replacement
Alteration
Results
$375,000 to $480,000 est. value
Moses Lake, WA 98837

Weatherization Residential Insulation 8560
Alteration
Results
WA

Arlington Library Roof Replacement
Alteration
Post-Bid
Arlington, WA 98223

Weatherization Residential Insulation 8554
Alteration
Results
WA

Weatherization - URGENT Roof
Alteration
Post-Bid
WA

Weatherization Residential Insulation 8580
Alteration
Results
WA

MHR Residential Composition and Membrane Roof West
Alteration
Post-Bid
$10,000 est. value
WA

Weatherization Residential Insulation 8549
Alteration
Results
WA

MHR Residential Composition Roof
Alteration
Post-Bid
Midland, Sumner, Tacoma, WA 98444

Weatherization Residential Insulation 8546
Alteration
Results
WA

Last Updated 03/20/2023 09:14 AM
Project Title

Washington State Penitentiary - East Complex Roof and Cooler Repairs

Physical Address View project details and contacts
City, State (County) Walla Walla, WA 99362   (Walla Walla County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,054,815 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For additional information about this project: Project Manager: Jack Brandt Phone: (360) 725-8337 A/E Firm: RGU Architecture and Planning Firm Contact: Robert Uhrich Phone: (509) 758-9894 FAX: Email: ruhrich@rguarchitecture.net Please direct questions regarding this project to the office of the Consultant. Additionally, all Public Works Bid Openings will be conducted via live stream on YouTube. A link to the live stream for bid opening can be found above. Contractors and the public will not be allowed to stay to watch the bid opening in person. We will strive to begin bid opening live streams within thirty minutes of the bid closing and appreciate your patience as we deploy this new process. If you have questions, please contact us at EASMail@des.wa.gov or call (360) 902- 7272 (voice message only). Security Clearance is Required in Order to Attend the Pre-bid Meeting. Provide Your Full Legal Name, Date of Birth, and Social Security Number by Email to Gisela.hanson@doc.wa.gov, or Telephone Gisela Hanson at (509) 520-7205 With This Information No Later Than the End of the Day Thursday, February 9, 2023. In accordance with RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder is required to provide the names of the Subcontractors with whom the Bidder will directly subcontract for the performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical for this project on Subcontractor List Form A within one hour of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. The Bidder shall also provide names of the Subcontractors with whom the Bidder will subcontract for structural steel installation and rebar installation on Subcontractor List Form B within 48 hours of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. Supplemental Bidder Responsibility will be evaluated for this project. In determining Bidder responsibility, the Owner shall consider an overall accounting of the criteria set forth in "DIVISION 00 SUPPLEMENTAL RESPONSIBILITY CRITERIA". Please direct questions regarding this subject to the office of the Consultant. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. The State reserves the right to accept or reject any or all bids and to waive informalities.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents