Similar Projects
HVAC Maintenance Services
Term Contract
Design
Middletown, Newark, DE - Easton, Prince Frederick, MD

HVAC and Related Systems Inspections and Maintenance
Alteration
Bidding
Wilmington, DE

Chiller Maintenance and Repair Services
Term Contract
Bidding
Newark, DE 19713

J059--Direct Digital Control Services
Post-Bid
Wilmington, DE 19807

Evans Hall Air Handler Unit Replacement
Post-Bid
Newark, DE 19716

DEANG Heatpump Inspections
Results
New Castle, DE

2902 Boiler Replacement
Results
Minquadale, DE 19720

J059--Direct Digital Control Services Wilmington VAMC
Post-Bid
Wilmington, DE

Chiller Replacement at Ferris School
Results
Wilmington, DE 19805

J045--Hood and Duct Services
Post-Bid
Wilmington, DE 19805

Carvel State Office Building - Cooling Tower & Boiler Replacement
Results
Less than $2,385,000 est. value
Wilmington, DE 19801

Middletown High School -Roof Replacement and HVAC Renovation
- 140,000 SF
Post-Bid
Middletown, DE 19709

DTCC Stanton Campus A-Wing HVAC
Results
Newark, DE 19713

HVAC Replacement
Alteration
Post-Bid
Wilmington, DE 19801

Debnam Building Rooftop HVAC
Results
New Castle, DE 19720

Last Updated 03/29/2022 01:35 PM
Project Title

Julia Building Cooling Tower Replacement - Efficiency and Sustainability

Physical Address View project details and contacts
City, State (County) New Castle, DE 19720   (New Castle County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Generally consists of, but is not limited to, the furnishing of all labor and materials required for the replacement of the cooling tower and pumps serving the DRBA Julia Building.

Details

Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Cooling Towers, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents