Similar Projects
RFQ Engineering - DM Airport Request for Qualifications General Civil Engineering Services
Term Contract
Bidding
Des Moines, IA 50309

RFP - Design Services DPS Fire Service Training Tower
Infrastructure
Bidding
$72,000 CJ est. value
Johnston, IA 50131

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

On-Call Sidewalk and Trail Design and Construction Phase Services
New Construction, Term Contract
Post-Bid
Des Moines, IA

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Architectural and Engineer /Design and Construction Management Services
Renovation, Alteration
Results
Des Moines, IA 50314

Architect-Engineer Services for Various Civil Works and Support for Other Agencies IDIQ
Renovation, Term Contract
Post-Bid
Less than $250,000,000 est. value

East Army Post and South East 36 Reconstruction
New Construction, Infrastructure
Post-Bid
Des Moines, IA 50982

Miscellaneous Traffic Studies
Infrastructure
Post-Bid
Des Moines, IA

DPS P09 Parking Lot Replacement
Renovation, Infrastructure
Post-Bid
Des Moines, IA

TH Grand Avenue Public Parking Lot Wall Repair Design Services
New Construction, Infrastructure
Post-Bid
Des Moines, IA 50312

CC DAS Tunnel Joint Repair
Renovation, Infrastructure
Post-Bid
Des Moines, IA

Mckinley Avenue Reconstruction Engineering Services
Infrastructure
Post-Bid
Des Moines, IA 50982

Fleur Drive Water Treatment Plant High Lift Variable Frequency Drive (VFD)
Renovation
Post-Bid
$300,000 CJ est. value
Des Moines, IA 50321

RFP Engineering - Post 12 Driveway Repairs
Infrastructure
Post-Bid
$300,000 CJ est. value
Des Moines, IA 50309

Last Updated 06/13/2023 11:02 AM
Project Title

Water Trails Planning

Physical Address View project details and contacts
City, State (County) Des Moines, IA 50309   (Polk County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected August 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 24, 2022, a design engineer has been selected. No firm timeline has been established for the construction. *The previous solicitation is listed below for reference The Department of Natural Resources (DNR) is seeking a qualified Respondent for professional planning services to develop a water trail plan for the Upper North Raccoon River, approximately 58 miles. Each water trail project will have its unique issues and nuances, and the DNR can't capture every possibility that may come along within the Statement of Work. The DNR does expect, however, the Respondent selected will be able to appropriately incorporate the salient pieces of information, as well as the more nuanced and unique pieces uncovered during the planning process. Respondent must have background in natural resources planning and AICP accreditation or a Landscape Architect with ASLA accreditation. Respondent must also be adept at graphic design and GIS mapping. The product deliverables must be in Adobe Creative Suites or Adobe Creative Cloud. A thorough understanding of ESRI desktop and online tools, such as, ARCGIS Online, Survey 123, and others is required in order to collect and disseminate information and finalize maps. And finally, in order to provide project continuity, the planner/project manager and team members identified in the proposal must not change, except for reasons beyond the control of the respondent, such as, sickness, employment change, etc. The planner/project manager is expected to be at each meeting, event, or function, and must be the direct point of contact with DNR project manager. DNR Issuing Officer: Philip Payton 502 E 9th Street Des Moines, Iowa 50319 515-361-0743 philip.payton@dnr.iowa.gov RFP written questions, requests for clarification, and suggested changes from Respondents are due: 8/2/2022 at 4:30pm DNR's written response to RFQ questions, requests for clarifications, and suggested changes are due: 8/5/2022 at 4:30pm The method of contractor selection has not been determined at this time As of June 13, 2023, no new information available

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents