Similar Projects
2022 Classroom Upgrades
Renovation
Bidding
Mundelein, IL

2022 Maintenance Garage
New Construction
Bidding
Antioch, IL 60002

2021 Summer Renovations at West Oak Campus and Diamond Lake School
Renovation
Post-Bid
Mundelein, IL 60060

Fitness Addition - East Building Addition Phase II
Addition - 89,000 SF
Post-Bid
Lincolnshire, IL 60069

Disaster Recovery Services
Results

East Building Addition Phase II - Fitness Addition
Addition
Results
Lincolnshire, IL 60069

Big Hollow MS Entryway Flooring
Addition, Alteration
Bidding
Ingleside, IL 60041

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

East Building Addition Phase II Project Fitness Addition
Addition
Results
Half Day, Lincolnshire, IL 60069

2022 EIFS Remediation
Renovation - 11,200 SF
Bidding
Vernon Hills, IL 60061

2021 Renovation Work
Renovation
Post-Bid
Less than $4,500,000 est. value
North Chicago, IL 60064

Edgewood Middle School Additions and Renovations
Renovation, Addition
Results
Less than $35,000,000 est. value
Highland Park, IL 60035

2022 Masonry Remediation and Steel Lintel Replacement
Renovation
Bidding
Libertyville, Vernon Hills, IL 60061

Summer 2021 Improvements at Palombi MS
Post-Bid
Lake Villa, IL

Interior Renovations at Lake Zurich High School - Bid Release 1
Results
Lake Zurich, IL

Reported 01/20/2022 12:00 AM
Project Title

Adlai E Stevenson HS - Bid Release 3

Physical Address View project details and contacts
City, State (County) Lincolnshire, IL 60069   (Lake County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 12/15/21
Owner View project details and contacts
Architect View project details and contacts
Description

Interior and exterior packages. Interior work includes the renovations of science classrooms, a health classroom, an office suite, and the replacement of boiler pumps. Exterior work includes tuckpointing and concrete repair, exterior demo, paving, landscaping, site lighting and site security work. All work has a scheduled completion for July 29, 2022. BID RELEASE 2 - BID PACKAGE BP# Description 02A Selective Demolition Work 04A Masonry and Tuckpointing Work 06A General Trades Work 09B Framing and Drywall Work 09C Acoustical Ceilings Work 09D Resilient Flooring and Ceramic Tile Work 09E Painting and Wallcoverings Work 21A Fire Protection Work 22A Plumbing Work 23A HVAC Work 26A Electrical Work 26B Site Electrical Work 31A Earthwork Work 32A Asphalt and Concrete Paving Work 32B Landscaping Work 33A Site Utilities Work

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents