Similar Projects
Railroad Avenue – CDBG 2016 – Water and Sewer System Improvements
Post-Bid
Cochran, GA

Magnolia Drainage Improvements
Post-Bid
Less than $275,000 est. value
Tifton, GA

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Mobley Park Storm Drainage Improvements
Results
Port Wentworth, GA

Replacement of the Streets and Drainage Improvements
Post-Bid
Jesup, GA 31545

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

36” CMP Rehabilitation
Post-Bid
GA

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

T32-D6-Drainage Rehab-Pickens-97322
Post-Bid
GA

Cherry-Church-Blanchard-King Avenues Drainage Improvements
Results
Pine Mountain, GA

Drainage Base and Pave Construction
Post-Bid
Lyons, GA 30436

Sequoia Circle Drainage Improvements Phase II
Results
Hinesville, GA 31310

T32-D6-Drain Rehab-Chattooga-97769
Post-Bid
GA

Pooler Old Town Drainage - Project B
Results
Less than $811,700 est. value
Pooler, GA 31322

Concrete Tongue and Groove Pipe
Post-Bid
GA

Reported 11/15/2019 12:00 AM
Project Title

Storm Drainage Improvements FY2018 CDBG

Physical Address View project details and contacts
City, State (County) Irwinton, GA 31042   (Wilkinson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment and labor for the construction of: Storm drainage improvements including installation of approximately 126 linear feet of 3-foot by 3-foot reinforced concrete box culvert, approximately 40 linear feet of 24-inch reinforced concrete pipe, approximately 1,500 linear feet of curb and gutter, and construction of approximately 2,600 linear feet of ditches. All work complete with paving and erosion control.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents