Similar Projects
Serene Lake Elementary Additions and Partial Replacements - Mukilteo School District
Addition, Demolition, Renovation, Infrastructure
Conception
$20,000,000 CJ est. value
Edmonds, WA 98026

Explorer Middle School Additions and Partial Replacements - Mukilteo School District
Addition, Demolition, Renovation, Infrastructure
Conception
$30,000,000 CJ est. value
Everett, WA 98204

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

Main Street Overlay Project From 6th Avenue to 8th Avenue
Infrastructure
Bidding
$937,000 CJ est. value
Edmonds, WA 98020

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Lord Hill Regional Park - Snohomish County
Term Contract
Pending Verification
$5,000,000 CJ est. value
Snohomish, WA 98290

Lord Hill Regional Park - Snohomish County
Term Contract
Pending Verification
$5,000,000 CJ est. value
Snohomish, WA 98290

County Forces Projects - Rivershore Road Flood Repair
Infrastructure
Design
$207,595 est. value
Clearview, WA 98290

Warm Beach Water System Water Replacement
Infrastructure
Post-Bid
$2,000,000 est. value
Stanwood, WA 98292

SR 204 Intersection Improvements
Infrastructure
Results
WA

Northwest Washington Rehab Hospital
New Construction, Infrastructure - 52,500 SF
Pending Verification
$15,000,000 CJ est. value
Lynnwood, WA 98087

Last Updated 03/03/2023 06:32 PM
Project Title

Powell Street Reconstruction

Physical Address View project details and contacts
City, State (County) Monroe, WA 98272   (Snohomish County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $688,178 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

I-5 Everett, East on US2 to N. Kelsey Street. Turn right and continue through light at West Main and N. Kelsey Street. Road becomes South Kelsey Street. At intersection of Powell Street and S. Kelsey Street turn left. Project limits are from South Kelsey Street on Powell Street to South Sams Street. Project Category Code: Utility Street Construction and Excavation, Street/Roadway Reconstruction Description: This Contract provides for the re-alignment and reconstruction of the roadway and limited utility infrastructure replacement at Powell Street between the intersections of Kelsey Street and South Sams Street. The project will remove and replace the existing roadway section; replace of approximately 25 LF of 8-inch, 495 LF of 6-inch, and 24 LF of 4-inch asphalt cement (AC) water main with approximately 520 LF of 8-inch and 20 LF of 6-inch ductile iron (DI) water main, including associated appurtenances; replacement of approximately 82 LF of existing presumed clay pipe with 8-inch PVC pipe including a mainline cleanout, connection of existing services, and installation of two new 6-inch PVC side sewer laterals for future connection (by others); and install approximately 300 LF of 12-inch PVC/HDPE storm drain pipe and new precast concrete catch basins. The anticipated work includes removal and replacement of roadway pavement, placement of Hot Mix Asphalt (HMA Cl. 1/2 in. PG 58H-22), pavement milling/planing and overlay, construction of ADA ramps, pavement markings, utility adjustments, temporary traffic control, property restoration, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. All Bid Proposals must be submitted on the forms furnished in the Contract Provisions, and each must be accompanied by a certified check, cashier's check, or bid bond (with authorized surety company as surety) made payable to the City of Monroe in an amount not less than five percent (5%) of the total bid including sales tax, and all listed additives and alternates, if any. Cash will not be accepted. A complete paper set of Bid Documents is also available for inspection at Monroe City Hall.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents