Similar Projects
Taxiway E Rehabilitation and North Cargo Taxilane Reconstruction
Infrastructure
Bidding
$10,000,000 to $20,000,000 est. value
Raleigh, NC

Corporate Hangar and Taxilane Expansion
New Construction, Alteration
Bidding
NC

Runway 5L-23R Replacement
Infrastructure
Sub-Bidding
$250,000,000 to $350,000,000 est. value
Raleigh, NC 27603

Runway 5R-23L Rehabilitation Project, Construction Phase 4
Post-Bid
Greensboro, NC 27409

Update Markings on Taxiway F
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Repair Airfield/Base Pavements at Seymour Johnson AFB, NC.
Results
$3,000 to $35,000,000 est. value
Goldsboro, NC 27531

Taxiway B Rehabilitation-Phase 2
Results
$10,000,000 to $20,000,000 est. value
Morrisville, NC 27560

Taxiways D and A1 Resurfacing
Post-Bid
Raleigh, NC

Runway 4 Approach Clearing
Results
New Bern, NC 28562

Airport - Partial Parallel Taxiway and Apron Expansion
Post-Bid
$3,500,000 to $3,800,000 est. value
Jefferson, NC 28640

East Corporate Area Development Phase 1 Project
Results
Statesville, NC 28687

Install Runway 23R ILS Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Cherry Point, NC

North Aircraft Apron Pavement Rehabilitation
Results
Currituck, NC

Repair Concrete at High Power Run Up Pit (HPRU) 4042
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC

West Apron Expansion - Phase II
Results
Oak Island, NC

Reported 03/17/2022 12:00 AM
Project Title

Harnett Regional Jetport Apron Expansion

Physical Address View project details and contacts
City, State (County) Erwin, NC 28339   (Harnett County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project shall consist of furnishing all labor, materials, and equipment and performing all work required to satisfactorily complete the Apron Expansion project. The project includes Schedule 1 - Concrete Pavement Alternative, and Schedule II – Bituminous Pavement Alternative. Items of work include erosion control, bituminous pavement milling, bituminous pavement removal, grading, drainage system removal and installation, placement of aggregate base course, bituminous surface course, cement concrete pavement, marking, lighting removal and installation, seeding and mulching.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents