Similar Projects
Plumbing Supplies
Bidding
Round Rock, TX 78681

Clemens Unit: Replace Structural Floor and Plumbing System - B Building Wings C and D
Bidding
Brazoria, TX 77422

Plumbing Services Citywide
Term Contract
Post-Bid
Dallas, TX 75201

Plumbing Services (City of Laredo Municipal Housing )
Post-Bid
Laredo, TX 78041

Houston District Plumbing Maintenance and Repair Service
Results
Angleton, Conroe, Hempstead, Rosenberg, Sugar Land, TX 77515

Houston District Plumbing Maintenance and Repair Service
Results
Angleton, Conroe, Hempstead, Rosenberg, Sugar Land, TX 77515

Webster City Hall Water Fountain
Bidding
Webster, TX 77598

Water Treatment System Repair and Service
Term Contract
Post-Bid
Fort Worth, TX 76102

Plumbing Maintenance and Supplies for 2019-2020
Term Contract
Results
Tuscola, TX 79562

Plumbing
Term Contract
Bidding
Corpus Christi, TX

Plumbing Maintenance and Repairs Services
Term Contract
Post-Bid
Abilene, TX 79601

Mechanical, Electrical, and Plumbing (MEP) Systems Renovations at Mexia State Supported Living Center
Results
$2,089,000 est. value
Mexia, TX 76667

CMAR UNT Coliseum MEP Renovation Phase 1
Bidding
Denton, TX 76201

Cummings CTE - CV4 Construction Technology MEP Upgrade
Post-Bid
Brownsville, TX 78521

Electrical, Plumbing and Spray on Insulation for a Three Bedroom Apartment
Results
De Leon, TX 76444

Last Updated 03/15/2021 10:44 AM
Project Title

Sanitary and Vent Pipe Rehabilitation, George HW Bush Federal Building, Midland, TX

Physical Address View project details and contacts
City, State (County) Midland, TX 79701   (Midland County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair existing sanitary waste and vent sewer and riser pipes of George HW Bush Federal Building. The four-story building (plus basement) was built in 1971. The existing cast iron pipes which extend from the basement up through the roof are suspected to be leaking, cracked, rusted, corroded, and/or clogged. The building requires these needed repairs to extend the life of the building, prevent damage, and provide a safe and comfortable atmosphere for tenants.

Details

Division 03 - Concrete, Precast Concrete.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents