Similar Projects
Plumbing Repair Services
Term Contract
Design
New Haven, CT 06510

South Thames Street Emergency Services Force Main and Utility Bridge Improvements
Infrastructure
Bidding
$425,000 CJ est. value
Norwich, CT 06360

Plumbing Services
Alteration
Post-Bid
Shelton, CT

Cafeteria Sink Replacement Academy
Alteration
Post-Bid
$100,000 est. value
East Haven, CT

Pool Repairs at High Schools
Renovation
Results
$538,997 CJ est. value
New Haven, CT 06510

SCADA System Upgrades
Renovation
Results
$4,254,998 CJ est. value
Bristol, CT 06010

On-Call Equipment and Labor Rates - Various Plumbing Services
Alteration
Post-Bid
Preston, CT

Sewer Repair and Related Construction Services
Infrastructure
Results
$7,988,100 CJ est. value
Hartford, CT 06103

Heating, Cooling, and Plumbing Services
Alteration
Post-Bid
Greenwich, CT

Farmington High School and FPS Central Office Projects - Bid Package 2.22b Rebid
Renovation
Results
$215,000 CJ est. value
Farmington, CT 06032

Exchange Place Utility Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Waterbury, CT 06704

2023 Water Main Project - East Hartford Water Main
Infrastructure
Results
$3,946,020 CJ est. value
East Hartford, CT 06118

Dawson Avenue Area Contract 3 Sewer and Manhole Rehabilitation Construction
Infrastructure
Post-Bid
$400,000 CJ est. value
West Haven, CT 06516

Installation of New Underdrainage System and Playground Surface at Stillmeadow Elementary School
Infrastructure
Results
$722,540 CJ est. value
Stamford, CT 06902

Supply and Replace One (1) ASME Compression Tank
Infrastructure
Post-Bid
$300,000 CJ est. value
Wallingford, CT 06492

Last Updated 09/30/2023 04:33 AM
Project Title

DLA OWS Fuel Tank Replacement

Physical Address View project details and contacts
City, State (County) Groton, CT 06340   (New London County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,076,300 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Only those Contractors listed below in MACC Solicitation are allowed to on this Proposal The scope of this project includes the removal and replacement of the existing oil water separator (OWS) and associated piping connections. Performance is to take place on DLA property at the Naval Submarine Base New London in Groton, CT. NAVFAC Solicitation No: 5997234 NAVFAC Specification Work Order No: 1733798 Title: DLA OWS Fuel Tank Replacement Location of Work: Naval Submarine Base New London, Groton, CT Description of Work: The scope of this project includes the removal and replacement of the existing oil water separator (OWS) and associated piping connections. Performance is to take place on DLA property at Naval Submarine Base New London in Groton, CT. (Attachments B) FAR 36.204-(f) Disclosure of of Construction: $1,000,000 to $5,000,000. NAICS Code: 236220 PSC: Y1JZ Time for Completion: All work shall be completed within 365 calendar days after contract . The proposed price shall be held at least 90 days. Wage Determination: The following Department of Labor (DOL) General Wage Decisions applies to this Task Order: General Decision Number: CT20230024 MOD 07 dated 06/16/2023 (Attachment D). Should these wage determinations be updated by the DOL prior to , the most current wage determination will be incorporated at time of . Clauses Incorporated by Reference FAR 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) FAR 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Services or Equipment (AUG 2020) FAR 52.204-27 Prohibition on a Bytedance Covered Application (June 2023) FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) FAR 52.211-15 Defense Priority and Allocation Requirements (APR 2008) FAR 52.228-5 Insurance-Work on a Government Installation (JAN 1997) FAR 52.228-15 Performance and Payment Bonds - Construction (OCT 2010) FAR 52.246-12 of Constructions (AUG 1996) DFARS 252.204-7006 Billing Instructions (OCT 2005) DFARS 252.232-7006 Wide Area Work Flow Payment Instructions (DEC 2018) SITE : IMPORTANT Tuesday, 11 July 2023 10:30 AM EST at the Naval Submarine Base New London, CT. Visitor requests must be received no later than 9AM EST, 10 July 2023 via e-mail to: john.a.papitto.civ@us.navy.mil and rebecca.j.spaulding.civ@us.navy.mil. This will be the only Government scheduled site visit. Please select no more than two (2) individuals per company. Contractors are urged to pick up their one-day passes by 9:30 AM EST on 11 July 2023. 1.Location: Meet outside Building 135 (Attachment H) 2. Pre-Site Visit Requirements: All visitors must show valid photo identification to enter. Valid ID includes: (1) verified driver's license with a star on it, (2) an unverified driver's license with a certified copy of birth certificate and social security card, OR (3) unverified driver's license with valid US passport. All vehicles must have current registration and insurance. All visitors must be U.S. citizens. (Attachment F) 3. Site Visit Restrictions: N/A 4. Badging: You must go to the pass and ID office before entering the base. Contractors who do not currently have a Rapid Gate Pass must submit a one-day pass request no later than 9:30 AM EST, 10 July 2023 via e-mail to: john.a.papitto.civ@us.navy.mil and rebecca.j.spaulding.civ@us.navy.mil Request for Information (RFIs): RFIs must be submitted in writing utilizing the attached RFI form (Attachment I) via to rebecca.j.spaulding.civ@us.navy.mil. An amendment will be issued with the consolidated RFIs answered. No further questions will be accepted after 9AM EST on 20 July 2023. Proposal Due Date: Tuesday, 14 August 2023 at 12PM EST Proposals must be emailed to rebecca.j.spaulding.civ@us.navy.mil. EVALUATION FACTORS FOR : 1. The solicitation requires the evaluation of Price. 2. The proposed Task Order will be awarded to the lowest evaluated price. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents