Similar Projects
Antioch Summit
New Construction, Infrastructure - 139,237 SF
Conception
$38,000,000 CJ est. value
Stone Mountain, GA 30088

Kathryn Avenue Bridge Replacement - City of Decatur
Demolition, New Construction, Infrastructure
Conception
$350,000 CJ est. value
Decatur, GA 30030

Fairfield Inn and Suites / Stone Mountain
New Construction, Infrastructure - 67,085 SF
Design
$10,000,000 CJ est. value
Stone Mountain, GA 30087

SR 10 / US 278 Fm CS 721 / Ashton Place to CR 5206 / Sams Crossing
Infrastructure
Design
$5,000,000 CJ est. value
Avondale Estates, GA 30002

Milling, Inlay and Plant Mix Resurfacing on SR 236
Infrastructure
Bidding
$500,000 CJ est. value
Tucker, GA 30084

High-Containment Continuity Laboratory, Building 28 (HCCL, B-28) - CDC Roybal Campus, Atlanta, GA
New Construction, Infrastructure - 100,000 SF
Post-Bid
$233,027,811 CJ est. value
Atlanta, GA 30329

WD Thomson Park Drainage Improvements
Infrastructure
Post-Bid
$426,462 CJ est. value
Decatur, GA 30033

Building Improvements at Coan Middle School
Renovation
Results
Less than $7,400,000 est. value
Atlanta, GA 30317

Dresden Park Stream Bank Stabilization
Infrastructure
Results
$1,716,177 CJ est. value
Chamblee, GA 30341

Chamblee International Logistics Park
New Construction, Infrastructure - 256,000 SF
Construction
$45,000,000 CJ est. value
Atlanta, GA 30341

Andy's Frozen Custard / Atlanta - Rebid
Demolition, New Construction, Infrastructure - 2,651 SF
Construction
$800,000 CJ est. value
Atlanta, GA 30329

The Tennis Center Project
New Construction, Infrastructure - 30,000 SF
Pending Verification
$50,000,000 CJ est. value
Stone Mountain, GA 30087

Lawrenceville Highway Townhomes
New Construction, Infrastructure
Pending Verification
$33,000,000 CJ est. value
Tucker, GA 30084

South McDonough Complete Streets - City of Decatur
Infrastructure
Conception
$800,000 CJ est. value
Decatur, GA 30030

East College Avenue Mixed-Use Development
New Construction, Infrastructure - 18,000 SF
Design
$30,000,000 CJ est. value
Decatur, GA 30030

Last Updated 02/20/2024 03:23 PM
Project Title

RFQ CMAR - New Sequoyah High School and Middle School

Physical Address View project details and contacts
City, State (County) Doraville, GA 30340   (DeKalb County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Design Development, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $150,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 20, 2024, A construction Manager for this project has been assigned. A firm construction timeline has not yet been released. DeKalb County School District, Georgia is interested in entering into a contract with a qualified firm to perform Construction Management at Risk Services as outlined in the contract to be entered into, the form of said contract being attached hereto for the New Sequoyah High and Middle School Project listed below in the Scope of Services. The CM is responsible for the successful, timely, and economical completion of the construction Project. The Work to be provided by Construction Contractor pursuant to the Contract shall be performed essentially in two phases; those phases being Pre-Construction Phase Services and Construction Phase Services, both of which are hereinafter defined. At the discretion of Owner, those two phases may overlap. Pre-Construction Phase Services. Construction Contractor shall review and comment upon the Construction Documents being developed by Design Professional. The scope of that review shall include reviewing those various documents for value engineering and constructability. As the Construction Documents are developed by Design Professional through the various design phases set forth in the Design Professional Services Agreement between Design Professional and Owner (Design Agreement), Construction Contractor shall provide Owner with detailed construction cost estimates with respect to those documents. Construction Contractor agrees to attend any and all design and preconstruction conferences and to otherwise assist and cooperate with Design Professional with respect to the design of the Project. Construction Contractor shall provide all other services during the conducted during the Pre-Construction Phase of the Project as set forth in the Contract Documents

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents