Similar Projects
Design - Correct Seismic Deficiencies-Phase1 Study Columbia
Renovation, Alteration
Design
$1,000,000 est. value
Columbia, MO 65201

Design - Correct Seismic Deficiencies-Phase1 Study Columbia
Renovation, Alteration
Design
$1,000,000 est. value
Columbia, MO 65201

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Engineering and Design Services - Ash Street Improvements
Infrastructure
Post-Bid
Columbia, MO

Conus Drilling Services - St. Louis District
Term Contract
Post-Bid

Engineering Services - Parks and Recreation Trail Bridge Studies
Term Contract
Post-Bid
Columbia, MO

Professional Engineering Services for Water Line Replacement
Alteration
Post-Bid
Ashland, MO

Various Airport Consulting Services
Term Contract
Post-Bid
Columbia, MO

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Engineering Services - Road Safety Audit (RSA)
Infrastructure
Post-Bid
Columbia, MO

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Last Updated 11/01/2022 02:14 PM
Project Title

RFQ Design - Replace Building 1 Roofs

Physical Address View project details and contacts
City, State (County) Columbia, MO 65201   (Boone County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Harry S Truman Veterans' Memorial Hospital (HSTVMH) - Columbia, MO Supplement B - Architect/Engineer (A/E) DESIGN SERVICES for "Replace Building 1 Roofs" Project No. 589A4-23-102 PROJECT NUMBER: 589A4-23-102 PROJECT TITLE: Replace Building 1 Roofs DESIGN TIMEFRAME: A/E shall deliver final construction documents NLT 142 calendar days after the Award/Notice to Proceed Letter CONSTRUCTION BUDGET/DESIGN LIMITATION: Magnitude of construction project range: $500,000-$1,000,000 The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents