Similar Projects
The Asphalt Reconstruction and Shouldering of Brugger Road, Rehfeldt Road, and Meyer Road
Infrastructure
Bidding
$800,000 est. value
Black Creek, Seymour, WI 54165

2021 Pavement Milling and Pulverizing
Post-Bid
WI

Maple Edge Park & Patriot Park Sports Courts
Post-Bid
$160,000 est. value
Appleton, Little Chute, WI 54913

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bread Creek Village Roadway
New Construction
Results
WI 54155

Hot Mix Asphalt Paving Program
Post-Bid
Grand Chute, WI

Concrete Paving
Renovation
Results
Less than $5,100,000 est. value
Appleton, WI

2021 Road Maintenance
Post-Bid
Medina, WI

2021 North Olk Street Reconstruction
Results
$210,000 est. value
Hortonville, WI 54944

New Trail Minor Block Retaining Wall Miscellaneous Grading and Riprapping Restoration
Alteration
Post-Bid
WI

Asphalt Pavement Maintenance
Term Contract
Results
Appleton, WI

Asphalt Paving Maintenance
Term Contract, Infrastructure
Post-Bid
Appleton, WI 54912

Asphalt Pavement Reconstruction
Renovation
Results
Appleton, WI

Concrete Maintenance and Replacement
Term Contract
Post-Bid
Appleton, WI 54914

Greenwood Road Roadway Reconstruction
Results
Greenville, WI

Last Updated 05/05/2022 05:38 AM
Project Title

Alley Paving

Physical Address View project details and contacts
City, State (County) Kaukauna, WI   (Outagamie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove asphalt pavement 4200 sqyare yards, common excation 2275 CY; geotextile fabric 5145 SY, 6 IN of 1 1/4 Base over 6 IN of 3 IN breaker course 5145 SY; 1.75 IN hot mix asphalt binder course, 4790 SY , 2.25 IN hot mix asphalt surface course 4790 SY; Turf Establishment 750 SY; 6 IN concrete apron/sidewalk, 30 IN concrete curb & gutter 312 LF, 12 IN storm sewer 300 LF; 8 IN storm sewer 23 LF; 48 IN Manhole (Storm) 14 VF 2'x3' Catch Basins, 8 VF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents