Similar Projects
14th Street Lift Station Improvements - SEW-23-002 - City of Burlington
Infrastructure
Conception
$120,000 CJ est. value
Burlington, IA 52601

14th Street Lift Station Improvements - SEW-23-002 - City of Burlington
Infrastructure
Conception
$120,000 CJ est. value
Burlington, IA 52601

2700 Main Street Storm Improvements
Infrastructure
Bidding
$50,000 CJ est. value
Burlington, IA 52601

Proposed Street Improvements - Middle Street and Prairie Street Paving
Infrastructure
Post-Bid
Mediapolis, IA 52637

RFQ Construction Manager - Construction Management (CM) Services for Healthcare Facility Expansion
Addition, Demolition, Renovation, Infrastructure - 1,640 SF
Post-Bid
West Burlington, IA 52655

Riverfront/Downtown Revitalization
Renovation, Infrastructure
Results
$17,655,000 est. value
Burlington, IA 52601

Hma Resurfacing With Milling
Infrastructure
Results
IA

Washington Street Improvements - STR-23-008 - City of Burlington
Infrastructure
Conception
$4,200,000 CJ est. value
Burlington, IA 52601

PCC Patching
Infrastructure
Results

Mason Road Detention Expansion - SEW-22-006 - City of Burlington
Infrastructure
Conception
$200,000 CJ est. value
Burlington, IA 52601

Bridge Cleaning
Infrastructure
Results
IA

Granular Surfacing of Roadway
Infrastructure
Results

2022 Seal Coat Streets Resurfacing
Infrastructure
Results
$500,000 est. value
Burlington, IA

Last Updated 11/04/2022 02:05 PM
Project Title

South Street Lift Station Replacement - SEW-23-001 - City of Burlington

Physical Address View project details and contacts
City, State (County) Burlington, IA 52601   (Des Moines County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $4,700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A full scope for this project has not been determined. The project is included in the city's 2023-2027 Capital Improvement Program (CIP). As of November 4, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents