Similar Projects
RFQ Engineering - Bay Memorial Walking Park / Garden Club
Infrastructure
Conception
$300,000 CJ est. value
Panama City, FL 32401

RFQ Engineering - Bay Memorial Walking Park / Garden Club
Infrastructure
Conception
$300,000 CJ est. value
Panama City, FL 32401

RFP D/B - Traffic Signal Mast Arm Hardening Design Build Project
Infrastructure
Design
$200,000 CJ est. value
Panama City, FL 32401

Murphy Express #8620 / Panama City
New Construction, Infrastructure - 2,800 SF
Design
$2,000,000 CJ est. value
Panama City, FL 32401

Asphalt Maintenance-Districtwide Maintenance
Infrastructure
Bidding
$500,000 est. value

Communication Lines Installation
Infrastructure
Bidding
$500,000 est. value
Panama City, FL 32403

Front Beach Road Segment 4.1 Powell Adams
Post-Bid
Panama City Beach, FL 32413

Biomass Storage
Post-Bid
Panama City, FL

Front Beach Road Segment 3 and Highway 79
Results
Panama City, FL

Street Resurfacing Project FY 2021
Results
Panama City Beach, FL 32413

Air Force Base Rebuild - Tyndall Air Force Base
Demolition, New Construction, Infrastructure
Pending Verification
$3,000,000,000 CJ est. value
Tyndall AFB, FL 32403

Camp Helen State Park - Sewer Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Sunnyside, FL 32413

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Resurfacing
Results
$5,484,117 est. value
FL

RFP D/B - Repair Sprung City Parking Lot on Tyndall AFB
Infrastructure
Bidding
$1,000,000 CJ est. value
Tyndall AFB, FL 32403

Last Updated 08/04/2022 06:03 PM
Project Title

AutoZone #5150 / Panama City

Physical Address View project details and contacts
City, State (County) Panama City, FL 32405   (Bay County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This project has been awarded.* *The Editorial Content team has obtained construction timeline information and construction documents directly from AutoZone

Details

Retail, 1 Story Above Grade, 19,544 SF Build-Out.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents