Similar Projects
North Union Mixed Use Master Plan
New Construction - 533,645 SF
Conception
$10,000,000 CJ est. value
Chicago, IL 60632

Jefferson Park Firehouse Apartments
Renovation
Conception
$2,400,000 est. value
Chicago, IL 60630

725 W Randolph Mixed Use
New Construction
Design
Chicago, IL 60601

Arlington Heights 425 Mixed Use
New Construction - 15,500 SF
Design
$150,000,000 est. value
Arlington Heights, IL 60005

Elizabeth Davis Renovation
Renovation
Bidding
$250,000 est. value
Chicago, IL 60624

Cassidy Place Mixed Use
New Construction
Sub-Bidding
$139,000,000 est. value
Chicago, IL 60654

Altgeld/ Murray Packages 1-14
Renovation
Post-Bid
Riverdale, IL 60827

ABLA Homes Packages 1 - 3
Renovation
Post-Bid
Chicago, IL

Englewood Square Phase II - Developer RFP
Results
Chicago, IL 60621

Elevator Construction Package 18
Renovation
Results
Chicago, IL

North Side Apartment & Office Building
New Construction, Build-Out - 27,500 SF
Construction
Chicago, IL 60654

1000M Mixed Use Development
New Construction - 50,000 SF
Construction
$470,000,000 est. value
Chicago, IL 60605

Senior Residence Facility
New Construction
Pending Verification
Arlington Heights, IL 60004

Residential Development
New Construction
Pending Verification
Arlington Heights, IL 60004

North Side Apartment Tower
New Construction
Conception
Chicago, IL

Last Updated 04/19/2022 03:01 PM
Project Title

National Public Housing Museum Residences

Physical Address View project details and contacts
City, State (County) Chicago, IL 60607   (Cook County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method General Contractor to Subcontract.
Project Status Permitting, Construction Start Expected May 2022, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $8,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of an existing unoccupied 3 1/2 story masonry building. Approximately 57% of the building will be core and shell finish. The remaining space will be build out as 15 residential units. Museum work will not be included in this scope. However, a portion of the first floor slab will be lowered and other base MEP work will be completed.

Details

37,533 SF - Apartments/Condominiums, 3 Stories Above Grade, 16,072 SF Renovation, 15 Unit(s).
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents