Similar Projects
Cline and Reiley Elementary Schools
New Construction, Renovation, Alteration
Conception
Alexandria, Cold Spring, KY 41076

HVAC Services
Alteration
Bidding
Louisville, KY

Arlington HVAC Replacement
Alteration
Bidding
Richmond, KY 40475

Replacing HVAC Units in All of Boyd County Courthouse
Post-Bid
Catlettsburg, KY 41129

C581 VAV Controls Install
Post-Bid
Lexington, KY 40502

MFWQTC Chiller Replacement
Results
$200,000 to $800,000 est. value
Louisville, KY 40211

Two Rooftop HVAC Units
Results
Independence, KY 41051

College of Education IAQ Improvements
Alteration
Bidding
Louisville, KY

ESSER II District Wide HVAC Upgrades
Post-Bid
Irvine, KY 40336

Workforce Development HVAC Upgrades
Results
Less than $70,065 est. value
Prestonsburg, KY

Replace And Install 4 Commercial Grade Air Cooled Air Conditioning (A/C) Split Systems And 7 Rooftop A/C Units
Alteration
Bidding
Louisville, KY 40212

College of Business HVAC Replacement
Post-Bid
Louisville, KY 40208

RCC Move/Install Chillers from KSR Dorms
Results
Less than $150,042 est. value
La Grange, KY

HVAC Full Service Maintenance
Term Contract, Infrastructure
Post-Bid
Erlanger, KY

HVAC and Piping Phase 1
Results
Less than $773,700 est. value
Frankfort, KY

Last Updated 12/15/2021 04:01 AM
Project Title

ACTC Replace Cooling Tower

Physical Address View project details and contacts
City, State (County) Ashland, KY 41101   (Boyd County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $278,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing cooling tower is nearing the end of its useful life. The packing and piping of the cooling tower has noticeable scale build-up, which negatively affects the efficiency of the tower. The galvanized steel basin has rust build up which causes contamination of the water and could lead to severe damage to the (2) condenser pumps serving the system. The existing cooling tower will be replaced with an updated multi-cell model that has the same capacity, while reusing the existing chiller. This means the majority of the above grade existing condenser water piping will need to be replaced to accommodate the new tower. The existing fan starters will be removed along with the associated controls specific to the existing cooling tower. The new multi-cell cooling tower is designed to meet the full cooling demand of building. However, if one of the cells requires maintenance or is having issues, we will be able to isolate the cell while the other is still in operation. Whisper Quiet propellers will be used for sound attenuation which are much quieter compared to the existing aluminum propellers. The basin would be constructed of 304 Stainless Steel. This is covered by a 5-year leak warranty. The overall footprint of the new tower will require the existing concrete pad to be extended to the existing retaining wall. All electrical connections/controls will be located in the basement mechanical room. New motor starters for each fan will be located in the existing Motor Control Center and each fan will have its own VFD.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents