Similar Projects
BIA Gap Analysis
Demolition, Term Contract - 10,800 SF
Post-Bid
Bethel, AK

Perform Modifications to the M/V Tustumena, including Temporary Services
Term Contract
Results
$5,000,000 to $10,000,000 est. value

Perform Modifications to the M/V Tustumena, including Temporary Services
Term Contract
Results
$5,000,000 to $10,000,000 est. value

Reported 11/16/2021 12:00 AM
Project Title

Boiler Safety Calibration and Inspection

Physical Address View project details and contacts
City, State (County) Eielson AFB, AK 99702   (Fairbanks North Star County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Base plus four year contract to inspect and maintain boilers on Eielson AFB. 1.1 Eielson AFB (EAFB) operates (14) pressurized vessels that maintain base facilities at a comfortable temperature for Air Force personnel to focus on the essential mission. These vessels can operate at a temperature of 650 degrees. 1.2 The contractor shall provide all personnel, labor, equipment, supervision and tools necessary to comply with EPA, OSHA, ADEC (Alaska Department of Environmental Conservation). 1.3 The contractor will be responsible to provide all labor, supervision, travel, Equipment and material to perform fourteen (14) National Board BA Boiler Inspections located at the Eielson AFB, Alaska. 1.4 The contractor shall provide all personnel, labor, equipment, supervision and tools necessary to test and calibrate safety valves on government owned coal fired boilers and other equipment. The contractor will also test (4) Kunkle boiler safety valves at the AUX Heat Plant located two blocks from the CHPP. Contractor shall comply with commercial and industry standards, and all applicable federal, state and local laws, regulations and procedures.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents