Similar Projects
Contractor - HVAC Repairs
Alteration
Design
$250,000 to $500,000 est. value
Westhampton Beach, NY 11978

HVAC Equipment Replacement at Longwood High School
Renovation
Sub-Bidding
$300,000 CJ est. value
Middle Island, NY 11953

Interior Renovations and Mechanical Scope at Dayton Avenue and South Street Elementary School H-3
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Manorville, NY 11949

HVAC Service and New Installations
Term Contract
Post-Bid
Yaphank, NY

Furnish, Deliver and Start-Up a Complete Tower Air Stripper Water Treatment System
Alteration
Post-Bid
Southampton, Tuckahoe, NY

Building Automation System Repairs (Hvac)
Alteration
Results
$250,000 to $500,000 est. value
Shoreham, NY 11786

Combination of Bond Phase 2,3 and 4 - HVAC
Alteration
Results
Bohemia, Ronkonkoma, NY 11716

Interior Renovations and Mechanical Scope at Eastport Elementary H-2
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Eastport, NY 11941

HVAC
Alteration
Post-Bid

Cooling Tower Maintenance and Water Treatment
Term Contract
Results
Stony Brook, NY

Roosevelt Quad Stair Towers (Greeley)
Renovation
Sub-Bidding
$200,000 CJ est. value
Stony Brook, NY 11794

Hvac Equipment Maintenance And Related Services
Term Contract
Post-Bid

HVAC Mechanical Upgrades Phase 2
Alteration
Results
Patchogue, NY 11772

Window Air Conditioning Units
Term Contract
Sub-Bidding
Lake Ronkonkoma, NY 11779

HVAC System Replacement
Alteration
Post-Bid
Holbrook, NY 11741

Last Updated 03/07/2023 03:25 PM
Project Title

Building Upgrades at Mount Sinai Middle School - Contract M HVAC Work

Physical Address View project details and contacts
City, State (County) Mount Sinai, NY 11766   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,685,000 [brand] Estimate
Plans Available from Copy Center - 01/20/23
Owner View project details and contacts
Architect View project details and contacts
Description

Building Upgrades at Mount Sinai Middle School - Contract M HVAC Work Make deposit check payable to the Mount Sinai Union Free School District. Bidder's deposit will be refunded if the set is returned in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. Non-bidders shall receive partial reimbursement, in an amount equal to the amount of the deposit, less the actual cost of reproduction of the documents if the set is returned in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Bids must be made in the standard proposal form in the manner designated therein and as required by the specifications that must be enclosed in sealed envelopes bearing the name of the job and name and address of the bidder on the outside, addressed to: MOUNT SINAI UNION FREE SCHOOL DISTRICT, clearly marked on the outside: Bid For: Building Upgrades at Mount Sinai Middle School. Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the MOUNT SINAI UNION FREE SCHOOL DISTRICT, in an amount equal to five percent (5%) of the total amount of the bid, as a commitment by the bidder that, if its bid is accepted, it will enter into a contract to perform the work and will execute such further security as may be required for the faithful performance of the contract. Certification of bonding company is required for this bid, see Instructions for Bidders section. Each bidder shall agree to hold his/her bid price for forty-five (45) days after the formal bid opening. t is the Board's intention to award the contracts to the lowest qualified bidder providing the required security who can meet the experience, technical and budget requirements. The Board reserves the right to reject any or all bids, waive any informality and to accept such bid which, in the opinion of the Board, is in the best interests of the School District.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents