Similar Projects
37 Unit Apartment Development-Shimer Square
Build-Out - 40,700 SF
Design
Mount Carroll, IL 61053

Shimer Square Phase 1A
Term Contract, Infrastructure, Renovation
Bidding
Mount Carroll, IL 61053

Shimer Square Phase 1A
Term Contract, Infrastructure, Renovation
Bidding
Mount Carroll, IL 61053

Installation of Oversized Chevrons along Interchange Ramp Curves at Various Locations
Infrastructure
Post-Bid

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Hot Mix Asphalt Road Improvements
Results
Lanark, IL

Savanna 2021 MFT Roadway Improvements
Infrastructure
Results
$725,000 est. value
Savanna, IL 61074

Beam End Repairs, Expansion Joint Replacement and Installation of Concrete Wearing Surface on SN 008-0015
Infrastructure
Bidding
$300,000 CJ est. value
Savanna, IL 61074

Carroll Apartments Housing Units 2022 Sidewalk and Patio Replacements
Infrastructure
Post-Bid
$100,000 est. value
Savanna, IL 61074

Freedom Road District Road Resurfacing
Infrastructure
Results
IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Front Entrance Sidewalk to the Front Door
Infrastructure
Results
Savanna, IL 61074

Downtown Sidewalk - Phase 1
Infrastructure
Results
$180,000 est. value
Mount Carroll, IL

RR-21-4821 Pavement Repairs
Infrastructure
Results

Last Updated 10/28/2022 04:07 PM
Project Title

Shimer Square Phase 1A

Physical Address View project details and contacts
City, State (County) Mount Carroll, IL 61053   (Carroll County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

Public Notice Rock Island Economic Growth Corporation d/b/a Economic Growth Corporation (the "Owner") will be accepting proposals for "Shimer Square Phase 1A" (the "Project") The Project generally includes the following renovations of its Shimer Square property: masonry restoration to the campus gate; general renovations and parking for the building commonly known as the Sawyer House; asbestos removal and interior building demolition for the buildings commonly known as Bennett and Hathaway Halls; and parking excavation and placement of base material. The Project is located at 203 E. Seminary Street within the corporate limits of Mount Carroll in Carroll County, Illinois. This Project is being funded by the State of Illinois' Rebuild Regional Economic Development Grant Program (the "Program"), authorized under Illinois Public Act 101-0029. In addition to complying with all applicable provisions of State and federal laws and regulations pertaining to nondiscrimination, sexual harassment and equal employment opportunity, successful contractors and subcontractors must comply with the following Program requirements: o Illinois Prevailing Wage Act (820 ILCS 130/) o Employment of Illinois Workers on Public Works Act (30 ILCS 570/001 et seq) o Illinois Works Jobs Program Act (30 ILCS 559/20) o Business Enterprise Program for Minorities, Females, and Persons with Disabilities Act ("BEP") (30 ILCS 575/0.01 et seq) The winning proposal will be announced on November 4, 2022 at 100 19th Street, Suite 109, Rock Island, IL, at 8:00 a.m. The Owner will select the winning proposal based on qualifications and past work experiences and reserves the right to reject any and all proposals or any part thereof and to waive any irregularities or technicalities in the proposals received pursuant to this notice.

Details

2 Stories Above Grade, 49,875 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents