Similar Projects
Asian & American Market
New Construction, Demolition, Infrastructure - 19,500 SF
Design
$1,800,000 est. value
Fargo, ND 58103

Street and Sidewalk Replacement
Term Contract
Design
Medora, ND 58645

Sidewalk & Shared Use Path Rehab/Reconstruction
Infrastructure
Bidding
$588,005 est. value
Fargo, ND

Hay Creek Trail Rehabilitation
Infrastructure
Bidding
$198,000 est. value
Bismarck, ND 58501

Parking Lot Replacement
Post-Bid
Fargo, ND

2021 Sidewalk Improvements
Infrastructure
Post-Bid
$80,000 est. value
Manvel, ND

Parking Lot Expansion
Results
Bismarck, ND

Brunsdale Parking Lot
Results
$200,000 est. value
Fargo, ND

Olaf-Anderson New Commercial Construction
New Construction, Infrastructure
Pending Verification
$1,223,541 est. value
Fargo, ND 58104

The Arch Phase 2
New Construction, Build-Out, Infrastructure - 188,310 SF
Pending Verification
$31,000,000 est. value
Fargo, ND 58103

Street and Storm Improvement District No. 2022-1; Citywide Street and Drainage Improvements
Infrastructure
Bidding
Mayville, ND

Sidewalk Replacement
Infrastructure
Post-Bid
$23,000 est. value
Michigan, ND

Bus Lane and Parking
Results
Bismarck, ND 58501

Permanent Flood Protection - Main Street Outlet Vault
Infrastructure
Bidding
$80,000 to $120,000 est. value
Valley City, ND

City Hall Parking Lot Expansion
Infrastructure
Post-Bid
West Fargo, ND 58078

Last Updated 04/13/2022 03:24 PM
Project Title

Prairie Nature Trail Reconstruction

Physical Address View project details and contacts
City, State (County) Epping, ND 58843   (Williams County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct the existing Prairie Nature Trail at Lewis and Clark State Park, renovation of two sets of stair cases along with replacement of rotting steps, leveling out elevation changes, re-establishing a section of trail that has been absorbed by a wetland, building a new boardwalk to go over a portion of currently inaccessible wetlands, and additional educational signage added to extend the length of the preexisting interpretive path located on the Prairie Nature Trail; (2) Mobilization and Demobilization; (3) Clean up and disposal of any construction waste and materials.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents