Similar Projects
Catholic Central School
Renovation, Addition
Conception
$5,000,000 est. value
Latham, NY 12110

Albany Academy STEAM Innovation Center
Addition, Demolition, Renovation, Infrastructure
Conception
$2,000,000 CJ est. value
Albany, NY 12208

Salamanca CSD Improvements - Phase 3.4
Design
Salamanca, NY 14779

Community Athletic Complex
New Construction
Design
Buffalo, NY 14216

Albany High School - Additions and Renovations - Phase 4 Fire Protection Contractor
Addition, Demolition, Renovation, Infrastructure
Bidding
$250,000 CJ est. value
Albany, NY 12203

Albany High School Additions & Renovations - Phase 4
Addition, Renovation, Infrastructure
Bidding
$4,000,000 CJ est. value
Albany, NY 12203

Union-Endicott CSD 2019 Capital Improvements Phase 2
New Construction
Post-Bid
$250,000 to $4,600,000 est. value
Endicott, NY 13760

Sweet Home CSD Capital Improvement Project 2019 - Phase 2
Renovation
Post-Bid
$18,000,000 est. value
Amherst, Buffalo, Tonawanda, NY 14228

Lancaster CSD Capital Improvements 2018
Renovation
Results
$397,000 to $2,457,000 est. value
Lancaster, NY 14086

Chazy Central Rural School 2021 Capital Outlay Project
Renovation
Results
$75,000 est. value
Chazy, NY

Hyde Park CSD - 2018 Capital Project - Phase 2
Renovation
Construction
Staatsburg, NY 12580

Clarence Central Schools Capital Improvements Project - Bid Package 1
Construction
Less than $9,000,000 est. value
Clarence, NY 14031

Buffalo Academy of Science Charter High
New Construction, Infrastructure - 70,000 SF
Pending Verification
$20,000,000 CJ est. value
Buffalo, NY 14202

Warring Elementary School and Poughkeepsie Middle School Renovation
Renovation, Infrastructure
Pending Verification
$50,541,306 CJ est. value
Poughkeepsie, NY 12601

Middle School - 2022 Capital Project - Ravena-Coeymans-Selkirk Central School District
Renovation, Infrastructure
Conception
$2,112,500 CJ est. value
Selkirk, NY 12158

Last Updated 05/05/2023 09:02 AM
Project Title

2021/2022 Capital Outlay Project

Physical Address View project details and contacts
City, State (County) Whitesboro, NY 13492   (Oneida County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $96,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Additional Doc Acq Note: Bidders wishing sets of plans and specifications mailed to them shall include, in addition to the Bidding Document deposit, an additional non-refundable delivery and handling charge of Thirty Dollars ($30.00) per set, payable by Separate check to Plan and Print Systems, Inc. Sets can also be overnight delivered to Upstate New York locations for a non-refundable delivery and handling charge of Forty Dollars ($40.00) per set. All requests for sets to be delivered to locations outside of Upstate New York will incur an additional shipping charge based on the metering increase for those locations. Upon request for bidding documents; provide Bidder's company name, Bidder's business and shipping address (if different), Contact person(s), Telephone number, Fax number, E-mail, and Prime Contract Trade affiliation. Return of Contract Documents: Upon returning sets promptly to PLAN AND PRINT SYSTEMS, INC., in re-usable condition, within 30 days after the date of the Bid opening, deposits will be refunded as follows: 1. Any Planholder will be refunded his deposit in full. 2. All Contract Documents received (except for Documents held by Successful Bidders) must be returned to Plan and Print Systems, Inc., 6160 Eastern Avenue, Syracuse, New York, 13211. 3. Deposits for documents, which are not returned within this 30-day period, will not be refundable. The Board of Education, above named, reserves the right to waive any irregularity and reject any or all Bids. Each Bidder must deposit, with his Bid, security in an amount not less than five percent (5%) of the Base Bid in the form and subject to the conditions provided in the Instructions to Bidders. Attention of Bidders is particularly called to requirements as to conditions of employment to be observed and attached wage rates schedule to be paid under this Contract. No Bidder may withdraw his Bid within thirty (30) days after the date set for the opening thereof. The Board of Education further reserves its right to disqualify Bidders for any material failure to comply with the "Instructions to Bidders" The District adheres to a policy of nondiscrimination on the basis of race, creed, color, disability, gender or national origin in employment, programs and services.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents