Similar Projects
Wildlife Parkway Pavement and Drainage Improvements
Infrastructure
Bidding
$39,000,000 est. value
TX

CS - Safety Improvement Projects
Infrastructure
Bidding
$1,626,221 est. value
TX

Midway Road Revitalization Project
Post-Bid
Dallas, TX 75254

Paving Improvements for Aspen Meadows Phase 2
Post-Bid
Dallas, TX

Southern Region Disaster Recovery Support BPA
Results

2019 Street Reconstruction
Results
$925,000 est. value
DeSoto, TX 75115

Heritage Building Alley, Paving and Utility Improvements
Infrastructure
Bidding
Mesquite, TX 75149

Asphalt Restoration
Post-Bid
Irving, TX

Paving Improvements for Briarwood Hills, Phase 1
Results
Dallas, TX

Street Reconstruction Group 17-3003
Infrastructure
Bidding
Dallas, TX 75232

Paving Contractor for a Construction Project
Post-Bid
Irving, TX

Street Reconstruction Group - 17-1006
Results
$1,518,259 est. value
Dallas, TX 75201

2022 Pavement Rejuvenation
Infrastructure
Bidding
Highland Park, TX

Alley Reconstruction: Dandelion Ln/Trumpet Dr & Thistle Ln/Daisy Ln
Post-Bid
$650,000 to $750,000 est. value
Rowlett, TX 75088

Alley Reconstruction - Group No. 17-1403
Results
Less than $2,200,000 est. value
Dallas, TX 75201

Last Updated 03/23/2022 01:50 PM
Project Title

Bottleneck Improvements Package 1

Physical Address View project details and contacts
City, State (County) Garland, TX   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,160,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 4,580 square yards of 11-inch concrete pavement, 1,272 square yards of 4-inch sidewalk pavement, six new traffic signals, barrier free ramps, modifications to storm drain, water and wastewater facilities and appurtenant items at four intersections within the City.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents