Similar Projects
Maxwell Creek Lift Station Bypass Pump
Bidding
Allen, TX 75002

Community ISD Lift Station Upgrades
Post-Bid
Nevada, TX 75173

Mantua Point Phase 1 Sewer Lift Station and Force Main
Post-Bid
Frisco, TX

Decommissioning of Lucy's Lift Station
Results
Celina, TX

Plano Eastside Pipeline Project
Results
$6,000,000 est. value
Plano, TX

Lift Station Project - US Highway 380 East
Results
Less than $560,000 est. value
Farmersville, TX

Sanitary Sewer Main and Lift Station Improvements - Milton Street
Results
Josephine, TX

Frisco Lakes Lift Station No. 1 Rehabilitation
Results
Frisco, TX 75034

F M 1378 Pump Station and Ground Storage Reservoir No. 1
Results
$5,997,000 est. value
Fairview, TX 75069

Celina Pump Stations Phase 2 Improvements
Results
$4,343,000 est. value
Celina, TX 75009

Lift Station Improvements for Bridgewater
Results
Princeton, TX

University Pump Station - Pump 8 Installation and Electrical Improvements
Results
$2,369,065 est. value
McKinney, TX 75069

Forest Grove Pump Station Improvements
Results
Princeton, TX

McKinney Lift Station Improvements
New Construction
Results
$28,000,000 to $30,000,000 est. value
Allen, TX 75002

Sister Grove Regional Water Resource Recovery Facility Phase I; Outfall Pipeline, Phase I; North McKinney Transfer Lift Station and North McKinney Transfer Force Main
Results
McKinney, TX 75069

Last Updated 07/24/2019 09:13 AM
Project Title

McKinney and Upper Cottonwood Creek Lift Stations Metering Improvements Project

Physical Address View project details and contacts
City, State (County) McKinney, TX   (Collin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $408,350
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project includes: Base Bid - Decommissioning of the existing wastewater metering system at the Upper Cottonwood Creek Lift Station and diversion of flow. Flow to be diverted through new 36” FRP piping and three new 6’ FRP manholes. Bypass pumping to be carried out during removal of existing piping and installation of new pipe. Additive Alternate - Installation of two flow meter vaults at the McKinney Lift Station: one on an existing 24” PVC Force Main and one on an existing 24” RCCP Force Main. Both force mains are active/in operation. Vault installation to include electrical and I&C installation to accommodate two Flexim F21 clamp-on flow meters. Installation of Flexim F721 clamp-on flow meters to be completed by others.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents