Similar Projects
The Dairy At Hillcrest
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Hogansville, GA 30230

I-185 From S of SR 1 to I-85
Infrastructure
Design
$4,000,000 CJ est. value
Lagrange, GA 30241

Bridge Rehabilitation on SR 219
Infrastructure
Bidding
$1,000,000 CJ est. value
Lagrange, GA 30240

Rosemont Elementary School
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Lagrange, GA 30241

Hamilton Road Utilities Relocation
Infrastructure
Post-Bid
$300,000 CJ est. value
Lagrange, GA 30241

Widening and Reconstruction on US 27/SR 1(Hamilton Road)
Infrastructure
Results
$24,496,534 CJ est. value
Bremen, GA 30110

Crossvine Village - Multi-Family and Commercial
New Construction, Infrastructure - 60,000 SF
Construction
$250,000,000 CJ est. value
Lagrange, GA 30241

Busch Drive Lift Station
Infrastructure
Post-Bid
$300,000 CJ est. value
Lagrange, GA 30241

Love's Travel Stop #771 / West Point
New Construction, Infrastructure - 17,064 SF
Post-Bid
$4,000,000 CJ est. value
West Point, GA 31833

Pavement Preservation and Maintenance Services - District 3
Infrastructure
Post-Bid
$400,000 CJ est. value
Lagrange, GA 30241

Contract B 2023 Hills & Dales Lift Station, Force Main & Sewer Improvements
Renovation, Infrastructure
Post-Bid
$100,000 CJ est. value
Lagrange, GA 30240

Install Fiber From Callaway High School Gym to the Baseball Hitting Facility
Infrastructure
Post-Bid
$57,985 CJ est. value
Hogansville, GA 30230

Starbucks - Merganser Commons at Hills & Dales / Lagrange
New Construction, Infrastructure - 2,500 SF
Post-Bid
$1,900,000 CJ est. value
Lagrange, GA 30240

Long Cane Elementary School Road Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Lagrange, GA 30240

Bass Cross Road Booster Pump Station
Infrastructure
Post-Bid
$900,000 CJ est. value
Hogansville, GA 30230

Last Updated 06/08/2023 03:05 PM
Project Title

Water System Improvements - Pine Street Elevated Water Tank

Physical Address View project details and contacts
City, State (County) Hogansville, GA 30230   (Troup County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,054,723 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment and labor for the construction of: 500,000 gallon elevated water tank complete with appurtenances and removal of existing standpipe. All Bidders must have a State of Georgia Utility Contractor License and must employ a state "Utility Manager" certificate holder who will have oversight of all the work. Time allotted for construction is 330 consecutive calendar days for substantial completion and 365 days for final completion. Proposals for the complete work in one general contract be made on the proposal form provided and shall contain prices in words and figures for the work bid on. The project is proposed to be funded with a State Revolving Fund loan. All SRF and American Iron and Steel Special Conditions requirements apply. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Hogansville, in the amount of at least 10% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Hogansville. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Hogansville as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents